← LeaderboardsInvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Noria Energy Holdings Llc
$4,619,237
Total funding
3
Grants
Funding over time
peak $2.5M · FY2021–25$2.5M$1.9M$1.3M$625K$0
'21
'22
'23
'24
'25
Funding mix
By agency
DOE$4,619,237 · 3
By mechanism
—$4,619,237 · 3
Investigators at Noria Energy Holdings Llc
InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).
Rising Stars
First grant in the last 5 yrs
Not enough data
Emerging Leaders
6–10 yrs in
Not enough data
All-Time
Most funded here, all years
Not enough data
Largest grants
DC BUS PLATFORM FOR FLOATING SOLAR POWERED AERATION$2,490,631
· FY2021 · Department of Energy
THE PROJECT GOAL IS TO DEVELOP A FLOATING SOLAR PHOTOVOLTAICS (FPV) TRACKING & POSITION SYSTEM THAT: (1) INCREASES ANNUAL ENERGY PRODUCTION OF FPV PROJECTS BY >10%, (2) LOWERS LEVELIZED COST OF ENERGY (LCOE) FOR FPV BY >10%, AND (3) LEVERAGES U.S. CONTRACT SUPPLY CHAIN & MANUFACTURING. THE OUTCOME OF THE PROJECT WILL BE A CERTIFIED TRACKING PRODUCT THAT HAS UNDERGONE EXTENSIVE FIELD TESTING AND IS READY FOR COMMERCIAL SALES. THE PRIMARY OBJECTIVES FOR EACH BUDGET PERIOD ARE:
• BP1: DEFINE PRODUCT REQUIREMENTS, DEVELOP INITIAL CONTROLS ARCHITECTURE AND DESIGN OTHER SUB-COMPONENTS, COMPLETE SMALL-SCALE PILOT TESTING, INSTALL A LARGER-SCALE PILOT, SECURE SITES FOR COMMERCIAL PILOTS, AND DEVELOP THE BETA-VERSION OF A USER PORTAL.
• BP2: COMPLETE CONTROL SYSTEM AND SUB-COMPONENT DESIGN, SUCCESSFUL DEMONSTRATION AND TESTING AT A COMMERCIAL PILOT, CERTIFICATION & BANKABILITY, FINALIZE USER PORTAL, AND COMPLETE VARIOUS COMMERCIALIZATION ACTIVITIES RELATED TO SUPPLY CHAIN, CUSTOMER ACQUISITION, AND SALES.$1,149,954
· FY2025 · Department of Energy
THE PROPOSED PROJECT SEEKS TO DEMONSTRATE THE POTENTIAL FOR HYBRIDIZING FLOATING PHOTOVOLTAICS (FPV) WITH HYDROPOWER FACILITIES THROUGHOUT THE UNITED STATES QUICKLY AND EFFECTIVELY WHILE UTILIZING DOMESTICALLY PRODUCED EQUIPMENT. THE PROJECT WOULD INVOLVE THE INSTALLATION AND OPERATION OF AN FPV SYSTEM AT THE PENSACOLA HYDROELECTRIC PROJECT, A 105-MEGAWATT IMPOUNDMENT HYDROPOWER FACILITY IN OKLAHOMA. PROJECT ACTIVITIES WOULD GENERATE DATA AND FINDINGS TO CONTRIBUTE TO EFFORTS WHICH QUANTIFY THE ECONOMIC AND TECHNICAL BENEFITS OF FPV-HYDROPOWER HYBRIDIZATION ON FACILITY OPERATIONS, SYSTEM DEPLOYMENT, AND ENVIRONMENTAL IMPACTS. PROJECT ACTIVITIES WOULD INCLUDE SITE ANALYSES, ENGINEERING DESIGN, PERMITTING, SOFTWARE DEVELOPMENT, COMPUTER SIMULATIONS, PHYSICAL SYSTEM DEPLOYMENT, AND DATA ANALYSIS.$978,652
· FY2025 · Department of Energy