← LeaderboardsInvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Ul Llc
$5,533,539
Total funding
3
Grants
Funding over time
peak $3M · FY2017–25$5M$3.8M$2.5M$1.3M$0
'17
'18
'19
'20
'21
'22
'23
'24
'25
Funding mix
By agency
DOE$5,533,539 · 3
By mechanism
—$5,533,539 · 3
Investigators at Ul Llc
InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).
Rising Stars
First grant in the last 5 yrs
Not enough data
Emerging Leaders
6–10 yrs in
Not enough data
All-Time
Most funded here, all years
Not enough data
Largest grants
BIPARTISAN INFRASTRUCTURE LAW (BIL) EXPANSION OF UL SOLUTIONS' NORTH AMERICA ADVANCED ELECTRIC VEHICLE CHARGING LABORATORY FOR INCLUSION OF ADDITIONAL DC FAST CHARGER TESTING CAPABILITY - THE OBJECTIVE OF THE PROJECT IS TO DESIGN AND BUILD A 500KW DC FAST CHARGER TEST LABORATORY TO COVER UL2202 AND UL9741 SAFETY STANDARDS AS WELL AS ENERGY STAR EVSE VERSION 1.1. THE LABORATORY WILL AT A MINIMUM BE SUPPLIED BY A 480VAC 3 PHASE CIRCUIT AND PRODUCE AN OUTPUT OF AT LEAST 1000VDC AND 500A.$2,997,220
· FY2025 · Department of Energy
BACKSHEETS: CORRELATION OF LONG-TERM FIELD RELIABILITY WITH ACCELERATED LABORATORY TESTING$1,321,752
· FY2017 · Department of Energy
A DATA-DRIVEN APPROACH TO REAL-WORLD DEGRADATION OF BACKSHEETS$1,214,567
· FY2019 · Department of Energy