GGrantIndex
← Search

BIPARTISAN INFRASTRUCTURE LAW (BIL) EXPANSION OF UL SOLUTIONS' NORTH AMERICA ADVANCED ELECTRIC VEHICLE CHARGING LABORATORY FOR INCLUSION OF ADDITIONAL DC FAST CHARGER TESTING CAPABILITY - THE OBJECTIVE OF THE PROJECT IS TO DESIGN AND BUILD A 500KW DC FAST CHARGER TEST LABORATORY TO COVER UL2202 AND UL9741 SAFETY STANDARDS AS WELL AS ENERGY STAR EVSE VERSION 1.1. THE LABORATORY WILL AT A MINIMUM BE SUPPLIED BY A 480VAC 3 PHASE CIRCUIT AND PRODUCE AN OUTPUT OF AT LEAST 1000VDC AND 500A.

$2,997,220FY2025Department of EnergyDOE

Ul Llc

Investigators

View source on USAspending →