← LeaderboardsInvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
City Of Quincy
$5,717,832
Total funding
3
Grants
Funding over time
peak $4.3M · FY2010–25$5M$3.8M$2.5M$1.3M$0
'10
'11
'12
'13
'14
'15
'16
'17
'18
'19
'20
'21
'22
'23
'24
'25
Funding mix
By agency
DOE$5,717,832 · 3
By mechanism
—$5,717,832 · 3
Investigators at City Of Quincy
InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).
Rising Stars
First grant in the last 5 yrs
Not enough data
Emerging Leaders
6–10 yrs in
Not enough data
All-Time
Most funded here, all years
Not enough data
Largest grants
SMART GRID INVESTMENT GRANT PROGRAM$3,842,082
· FY2010 · Department of Energy
THE PROPOSED PROJECT CONSISTS OF INSTALLATION OF SOLAR PHOTOVOLTAIC (PV) SYSTEMS AT TWO (2) CITY-OWNED
PROPERTIES. THESE SOLAR PV SYSTEMS ARE PRIMARILY INTENDED TO REDUCE THE CITY’S OPERATING EXPENSES BY
OFFSETTING, IN WHOLE OR IN PART, ELECTRIC ENERGY REQUIREMENTS AT EACH OF THE SITES.
APPROXIMATELY EIGHT (8) ACRES OF GROUND-MOUNTED ARRAYS WILL BE INSTALLED AT THE CITY’S WASTEWATER
TREATMENT FACILITY (WWTF) LOCATED AT 700 WEST LOCK & DAM ROAD. THESE ARRAYS SHOULD GENERATE AN ANNUAL
AVERAGE OF ROUGHLY 2,000 KILOWATT-HOURS PER DAY, WITH PEAK GENERATING CAPACITY OCCURRING AT THE TIME OF
PEAK ELECTRIC DEMAND FOR THE WWTF. THE GROUND TO BE CONVERTED TO SOLAR ARRAY INSTALLATION IS FLAT,
SANDY SOIL THAT IS COVERED BY TURFGRASS, WHICH MAKES IT IDEAL FOR INSTALLATION OF GROUND-MOUNTED
PANELS.
APPROXIMATELY 2.2 ACRES OF GROUND-MOUNTED ARRAYS WILL BE INSTALLED ON TOP OF A FINISHED WATER RESERVOIR
FOR THE CITY’S PUBLIC WATER SUPPLY. THESE ARRAYS SHOULD GENERATE AN ANNUAL AVERAGE OF ROUGHLY 500
KILOWATT-HOURS PER DAY, WITH PEAK GENERATING CAPACITY OCCURRING AT THE TIME OF PEAK ELECTRIC DEMAND FOR
ADJACENT RESERVOIR PUMP STATION. THE GROUND TO BE CONVERTED TO SOLAR ARRAY INSTALLATION IS VERY FLAT,
CLAY SOIL THAT IS COVERED BY TURFGRASS, WHICH MAKES IT IDEAL FOR INSTALLATION OF GROUND-MOUNTED PANELS.$1,400,000
· FY2025 · Department of Energy
TAS::89 0321::TAS QUINCY AREA HYDROPOWER PROJECT$475,750
· FY2010 · Department of Energy