← LeaderboardsInvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Membrane Technology And Research, Inc.
Newark, CA
$116,728,042
Total funding
23
Grants
Funding over time
peak $75.1M · FY2008–25$100M$75M$50M$25M$0
'08
'09
'10
'11
'12
'13
'14
'15
'16
'17
'18
'19
'20
'21
'22
'23
'24
'25
Funding mix
By agency
DOE$116,628,042 · 22
NSF$100,000 · 1
By mechanism
—$116,728,042 · 23
Investigators at Membrane Technology And Research, Inc.
InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).
Rising Stars
First grant in the last 5 yrs
Not enough data
Emerging Leaders
6–10 yrs in
Not enough data
All-Time
Most funded here, all years
Not enough data
Largest grants
DE-FE0031587 PROJECT TITLED: LARGE PILOT TESTING OF THE MEMBRANE TECHNOLOGY RESEARCH MEMBRANE POST-COMBUSTION CARBON DIOXIDE CAPTURE PROCESS$62,077,501
· FY2018 · Department of Energy
NEW AWARD NUMBER DE-FE0031591
TITLE: ''SCALE-UP AND TESTING OF ADVANCED POLARIS MEMBRANE CO2 CAPTURE TECHNOLOGY''$8,166,304
· FY2018 · Department of Energy
MEMBRANE HYBRID PROCESS FOR DEEP DECARBONIZATION OF INDUSTRY
THE GOALS OF THIS PROJECT ARE TO DESIGN AND BUILD AN ENGINEERING-SCALE MEMBRANE HYBRID CAPTURE SYSTEM FOR OPERATION AT A CEMENT PLANT; TO COMPLETE A SIX-MONTH FIELD TEST OF THE HYBRID MEMBRANE PROCESS TREATING FLUE GAS FROM THE CEMENT PLANT TO SHOWCASE THE ABILITY OF THE PROCESS TO EFFICIENTLY CAPTURE MORE THAN 95 PERCENT OF THE CARBON DIOXIDE EMISSIONS FROM AN INDUSTRIAL SOURCE; TO IMPLEMENT A COMMUNITY BENEFITS PLAN TO QUANTIFY THE POSITIVE IMPACTS OF THE CAPTURE TECHNOLOGY ON THE LOCAL COMMUNITY AND WORKFORCE; AND TO PREPARE A TECHNO-ECONOMIC ANALYSIS, ENVIRONMENTAL HEALTH AND SAFETY RISK ASSESSMENT, AND A TECHNOLOGY MATURATION PLAN FOR THE MEMBRANE HYBRID CAPTURE PROCESS AT THE CEMENT PLANT.$6,999,898
· FY2025 · Department of Energy
DE-FE0031846 WITH MEMBRANE TECHNOLOGY AND RESEARCH, INCORPORATED TITLED ''COMMERCIAL-SCALE FRONT-END ENGINEERING DESIGN STUDY FOR MEMBRANE TECHNOLOGY AND RESEARCH’S (MTR) MEMBRANE CARBON DIOXIDE (CO2) CAPTURE PROCESS''.$5,120,310
· FY2019 · Department of Energy
FULLY FUND BP1 FROM $847,088 BY $547,087 TO $1,394,175; GRANT A 3 MONTH NCTE TO BP1; AND REVISE REPORTING REQUIREMENTS (SF-425)$4,180,062
· FY2009 · Department of Energy
DE-FE0007553 NEW AWARD ENTITLED "LOW-PRESSURE MEMBRANE CONTACTORS FOR CARBON DIOXIDE CAPTURE"$3,982,793
· FY2012 · Department of Energy
INTEGRATED TESTING OF A MEMBRANE CARBON DIOXIDE CAPTURE PROCESS WITH A COAL-FIRED BOILER$3,733,325
· FY2017 · Department of Energy
BENCH-SCALE DEVELOPMENT OF A HYBRID MEMBRANE-ABSORPTION CO2 CAPTURE PROCESS$3,209,651
· FY2013 · Department of Energy
TAS::89 0211::TAS RECOVERY ACT: PHASE III XLERATOR PROGRAM- FIELD DEMONSTRATION OF CO2 CAPTURE FROM COAL-DERIVED SYNGAS$2,998,258
· FY2010 · Department of Energy
NEW AWARD NUMBER DE-FE0031596
TITLE: ''DEVELOPMENT OF SELF-ASSEMBLY ISOPOROUS SUPPORTS ENABLING TRANSFORMATIONAL MEMBRANE PERFORMANCE FOR COST EFFECTIVE CARBON CAPTURE''$2,905,620
· FY2018 · Department of Energy
ACETIC ACID RECOVERY USING MEMBRANES$2,199,334
· FY2009 · Department of Energy
DE-FE0031632 PROJECT TITLED ''BENCH-SCALE DEVELOPMENT OF A TRANSFORMATIVE MEMBRANE PROCESS FOR PRE-COMBUSTION CO2 CAPTURE''$2,000,000
· FY2018 · Department of Energy
NOVEL POLYMER MEMBRANE PROCESS FOR PRE-COMBUSTION CO2 CAPTURE FROM COAL-FIRED SYSTEMS$1,905,528
· FY2009 · Department of Energy
MEMBRANE TECHNOLOGY AND RESEARCH, INC.
PROJECT - ENGINEERING DESIGN OF A POLARIS MEMBRANE CO2 CAPTURE SYSTEM AT A CEMENT PLANT.$1,493,318
· FY2021 · Department of Energy
TAS::89 0321::TAS NOVEL MEMBRANES AND PROCESSES FOR OXYGEN ENRICHMENT$1,046,176
· FY2010 · Department of Energy
MEMBRANE SYSTEMS FOR COAL BED CARBON DIOXIDE SEQUESTRATION AND METHANE PRODUCTION$849,952
· FY2008 · Department of Energy
BIOBUTANOL PRODUCTION WITH HYBRID MEMBRANE DISTILLATION$849,839
· FY2008 · Department of Energy
BIOETHANOL PRODUCTION WITH MIXED MATRIX MEBRANES$849,749
· FY2008 · Department of Energy
NEW AWARD ENTITLED, "MEMBRANE PROCESS TO CAPTURE CARBON DIOXIDE FROM COAL-FIRED POWER PLANT FLUE GAS."$847,088
· FY2008 · Department of Energy
NEW AWARD ENTITLED, "MEMBRANE PROCESS TO SEQUESTER CO2FFORM POWER PALN FLUE GAS$688,266
· FY2008 · Department of Energy