MEMBRANE HYBRID PROCESS FOR DEEP DECARBONIZATION OF INDUSTRY THE GOALS OF THIS PROJECT ARE TO DESIGN AND BUILD AN ENGINEERING-SCALE MEMBRANE HYBRID CAPTURE SYSTEM FOR OPERATION AT A CEMENT PLANT; TO COMPLETE A SIX-MONTH FIELD TEST OF THE HYBRID MEMBRANE PROCESS TREATING FLUE GAS FROM THE CEMENT PLANT TO SHOWCASE THE ABILITY OF THE PROCESS TO EFFICIENTLY CAPTURE MORE THAN 95 PERCENT OF THE CARBON DIOXIDE EMISSIONS FROM AN INDUSTRIAL SOURCE; TO IMPLEMENT A COMMUNITY BENEFITS PLAN TO QUANTIFY THE POSITIVE IMPACTS OF THE CAPTURE TECHNOLOGY ON THE LOCAL COMMUNITY AND WORKFORCE; AND TO PREPARE A TECHNO-ECONOMIC ANALYSIS, ENVIRONMENTAL HEALTH AND SAFETY RISK ASSESSMENT, AND A TECHNOLOGY MATURATION PLAN FOR THE MEMBRANE HYBRID CAPTURE PROCESS AT THE CEMENT PLANT.