← LeaderboardsInvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Toray Advanced Composites Usa, Inc.
$1,236,015
Total funding
5
Grants
Funding over time
peak $1.2M · FY2021–22$2M$1.5M$1M$500K$0
'21
'22
Funding mix
By agency
NASA$1,236,015 · 5
By mechanism
—$1,236,015 · 5
Investigators at Toray Advanced Composites Usa, Inc.
InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).
Rising Stars
First grant in the last 5 yrs
Not enough data
Emerging Leaders
6–10 yrs in
Not enough data
All-Time
Most funded here, all years
Not enough data
Largest grants
PARTICIPATION IN THE NASA HIGH RATE COMPOSITES AIRCRAFT MANUFACTURING HICAM PROJECT PHASE 1 PERFORMING WORK APPROVED BY NASA AND THE ADVANCED COMPOSITES CONSORTIUM$1,201,661
· FY2022 · National Aeronautics and Space Administration
ACHIEVING THE OVERALL PROJECT GOAL WILL REQUIRE IMPROVEMENTS ACROSS THE SEVEN MAJOR AREAS THAT DRIVE HIGH RATE COMPOSITE AIRCRAFT MANUFACTURING: MATERIALS ARCHITECTURES LAYDOWN CURE ASSEMBLY INSPECTION AND PAINT.$19,044
· FY2021 · National Aeronautics and Space Administration
THE PRIMARY GOAL OF THE HI-RATE COMPOSITE AIRCRAFT MANUFACTURING (HICAM) PROJECT IS TO DEMONSTRATE MANUFACTURING APPROACHES AND ASSOCIATED TECHNOLOGIES FOR LARGE COMPOSITE AIRFRAME STRUCTURES THAT ENABLES A 4-6X PRODUCTION RATE INCREASE WITHOUT COST$5,210
· FY2021 · National Aeronautics and Space Administration
STRUCTURAL SIZING TOOLS-TORAY$5,100
· FY2021 · National Aeronautics and Space Administration
THE PRIMARY GOAL OF THE HICAM PROJECT IS TO DEMONSTRATE MANUFACTURING APPROACHES AND ASSOCIATED TECHNOLOGIES FOR LARGE COMPOSITE AIRFRAME STRUCTURES$5,000
· FY2021 · National Aeronautics and Space Administration