← LeaderboardsInvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Cgtech
$600,780
Total funding
3
Grants
Funding over time
peak $501.2K · FY2021–22$1M$750K$500K$250K$0
'21
'22
Funding mix
By agency
NASA$600,780 · 3
By mechanism
—$600,780 · 3
Investigators at Cgtech
InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).
Rising Stars
First grant in the last 5 yrs
Not enough data
Emerging Leaders
6–10 yrs in
Not enough data
All-Time
Most funded here, all years
Not enough data
Largest grants
SINGLE SOURCE PARTICIPATION IN THE NASA HIGH-RATE COMPOSITES AIRCRAFT MANUFACTURING (HICAM) PROJECT PHASE 1 PERFORMING WORK APPROVED BY NASA AND THE ADVANCED COMPOSITES CONSORTIUM. P1.DFM.TDA.01: DESIGN FOR MANUFACTURING$501,199
· FY2022 · National Aeronautics and Space Administration
THE PRIMARY GOAL OF THE HI-RATE COMPOSITE AIRCRAFT MANUFACTURING (HICAM) PROJECT IS TO DEMONSTRATE MANUFACTURING APPROACHES AND ASSOCIATED TECHNOLOGIES FOR LARGE COMPOSITE AIRFRAME STRUCTURES THAT ENABLES A 4-6X PRODUCTION RATE INCREASE WITHOUT COST$91,106
· FY2021 · National Aeronautics and Space Administration
THE PRIMARY GOAL OF THE HI-RATE COMPOSITE AIRCRAFT MANUFACTURING (HICAM) PROJECT IS TO DEMONSTRATE MANUFACTURING APPROACHES AND ASSOCIATED TECHNOLOGIES FOR LARGE COMPOSITE AIRFRAME STRUCTURES THAT ENABLES A 4-6X PRODUCTION RATE INCREASE WITHOUT COST$8,475
· FY2021 · National Aeronautics and Space Administration