GGrantIndex
← Leaderboards

Airfoils Inc

Compare ↔
$768,810
Total funding
2
Grants

Funding over time

peak $669.3K · FY200815
$1M$750K$500K$250K$0
'08
'09
'10
'11
'12
'13
'14
'15

Funding mix

By agency

NASA$768,810 · 2

By mechanism

$768,810 · 2

Investigators at Airfoils Inc

InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).

Rising Stars

First grant in the last 5 yrs

Not enough data

Emerging Leaders

6–10 yrs in

Not enough data

All-Time

Most funded here, all years

Not enough data

Largest grants

WIND-TUNNEL TESTS OF THREE HEAVY-LIFT TILROTOR AIRFOILS$669,250
· FY2008 · National Aeronautics and Space Administration
A ONE-YEAR FLOW-CONTROL AIRFOIL DESIGN AND ANALYSIS EFFORT IS PROPOSED THAT COMPRISES A COLLABORATION BETWEEN AIRFOILS INCORPORATED AND THE U.S. GOVERNMENT. THE THREE TASKS TO BE PERFORMED AS OUTLINED IN THE DRAFT STATEMENT OF WORK ARE:1. AIRFOILS INCORPORATED WILL PARTICIPATE IN AN ON-SITE DESIGN REVIEW WITHIN 14 DAYS OF CONTRACT AWARD AND SERVE AS OUTSIDE EXPERTS IN THE PEER REVIEW OF THE U.S. GOVERNMENT F3 DESIGN. THE ONE-DAY REVIEW WILL COVER MATERIALS SUPPLIED BEFOREHAND TO AIRFOILS INCORPORATED. A LETTER REPORT WILL BE PROVIDED WITHIN FOUR WEEKS OF CONTRACT AWARD DETAILING THE REVIEW OF THE U.S. GOVERNMENT EFFORT TO DATE ALONG WITH RECOMMENDATIONS CONCERNING THE DESIGN AND THE FLOW-CONTROL STRATEGY. THE U.S. GOVERNMENT WILL HAVE SOLE OWNERSHIP OF THE REPORT AND CONTROL ITS DISTRIBUTION.2. AIRFOILS INCORPORATED WILL COLLABORATE WITH U.S. GOVERNMENT PERSONNEL TO REFINE THE U.S. GOVERNMENT DESIGNED MODEL-SCALE F3 AIRFOIL FOCUSING ON HOVER. THE STUDY WILL INCLUDE A REVIEW AND DISCUSSION OF THE MODEL-SCALE AIRFOIL THE FLOW-CONTROL STRATEGY AND OFF-DESIGN CASES. AIRFOILS INCORPORATED PERSONNEL WILL ATTEND A DEMONSTRATION OF THE BENCHTOP HARDWARE THAT HAS BEEN DEVELOPED TO DATE. A LETTER REPORT DESCRIBING THE RESULTS OF THE COLLABORATION WILL BE PROVIDED WITHIN EIGHT WEEKS OF CONTRACT AWARD. THE U.S. GOVERNMENT AND AIRFOILS INCORPORATED WILL HAVE SHARED RIGHTS TO USE THE REFINED MODEL-SCALE AIRFOIL WITHOUT COST FOR U.S. MILITARY OR U.S. GOVERNMENT RESEARCH-AND-DEVELOPMENT AIRCRAFT AND PROJECTS. DISTRIBUTION OF THE AIRFOIL BEYOND THESE TWO PARTIES WILL REQUIRE THE APPROVAL OF BOTH PARTIES. THE U.S. GOVERNMENT WILL CONTROL DISTRIBUTION OF THE REPORT.3. AIRFOILS INCORPORATED WILL COLLABORATE WITH U.S. GOVERNMENT PERSONNEL TO DEVELOP A STRATEGY FOR FULL-SCALE ROTOR DESIGN EXTENDING THE MODEL-SCALE AIRFOIL TO FULL-SCALE. THE STUDY WILL COVER BOTH HOVER AND FORWARD FLIGHT TO ESTABLISH DESIGN CONDITIONS AND MAY INCLUDE CONFIGURATION-SPECIFIC DESIGN CONSIDERATIONS REVIEW OF TEST DATA AND INTERACTION WITH INDUSTRY ROTOR-BLADE DESIGNERS. THE RESULTING AIRFOIL WILL BE DESIGNATED THE SM421. A FORMAL REPORT DESCRIBING THE AIRFOIL DESIGN WILL BE PROVIDED WITHIN ONE YEAR OF CONTRACT AWARD. THEU.S. GOVERNMENT AND AIRFOILS INCORPORATED WILL HAVE SHARED RIGHTS TO USE THE SM421 AIRFOIL WITHOUT COST FOR U.S. MILITARY OR U.S. GOVERNMENT RESEARCH-AND-DEVELOPMENT AIRCRAFT AND PROJECTS. DISTRIBUTION OF THE AIRFOIL BEYOND THESE TWO PARTIES WILL REQUIRE THE APPROVAL OF BOTH PARTIES. AIRFOILS INCORPORATED MAY LICENSE THE AIRFOIL TO THIRD PARTIES FOR COMMERCIAL USE SUBJECT TO U.S. GOVERNMENT APPROVAL IN EACH INSTANCE. THE U.S. GOVERNMENT WILL CONTROL DISTRIBUTION OF THE REPORT.$99,560
· FY2015 · National Aeronautics and Space Administration