GGrantIndex
← Leaderboards

Firstelement Fuel Inc.

Compare ↔
$9,550,000
Total funding
1
Grants

Funding mix

By agency

DOE$9,550,000 · 1

By mechanism

$9,550,000 · 1

Investigators at Firstelement Fuel Inc.

InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).

Rising Stars

First grant in the last 5 yrs

Not enough data

Emerging Leaders

6–10 yrs in

Not enough data

All-Time

Most funded here, all years

Not enough data

Largest grants

NEXT GENERATION MULTI-USE HEAVY-DUTY HIGH-FLOW DIRECT-FILL HYDROGEN REFUELING STATION WITH STANDARDIZED DESIGN THE GOAL OF THIS FOA PROJECT IS TO DESIGN, DEVELOP, BUILD, INSTALL, AND DEMONSTRATE AN ADVANCED NEXT GENERATION MULTI-USE (GH2 H70/H70HF AND SLH2) DIRECT FILL (MUDF) H2 STATION. THIS WILL ENABLE THE MARKET FOR MD/HD FUEL CELL TRUCKS TO BE COMMERCIALLY VIABLE SIMULTANEOUSLY, ACCOMMODATING LD FUEL CELL VEHICLES. COMMERCIALLY VIABLE INDICATES THAT; H2 CAN BE SOLD AT A PRICE WHERE OWNERSHIP AND OPERATION OF H2 STATIONS AND OWNERSHIP AND OPERATION OF LD/MD/HD VEHICLES ARE BOTH PROFITABLE. THE OBJECTIVES OF THIS FOA PROJECT ARE DELINEATED BELOW BY THE FOUR BUDGET PERIODS. BUDGET PERIOD 1: COMPONENT AND CONTROLS DESIGN: THE OBJECTIVE IN THIS PHASE IS TO USE THE NREL DYNAMIC SIMULATION MODEL AND TEA MODEL TO INFORM AND OPTIMIZE THE SYSTEM DESIGN. THE SYSTEM COMPONENTS AND CONTROLS WILL BE DESIGNED ON PAPER BASED ON THE PERFORMANCE CRITERIA ESTABLISHED BY THE PROJECT TEAM AND THROUGH MODELING. IN THE FIRST YEAR, THE TEAM WILL ALSO CONDUCT PRELIMINARY FUELING TESTING ON THE PROTOTYPE UNIT IN LIVERMORE CALIFORNIA. LATER IN THE YEAR, THE FIRST PRE-COMMERCIAL UNIT WILL BE INSTALLED AT THE PORT OF OAKLAND HD STATION FOR REAL WORLD LIMITED TESTING. BUDGET PERIOD 2: COMPONENT BUILD AND TEST: AFTER DESIGN AND PRELIMINARY TESTING ON THE PROTOTYPE AND PRE-COMMERCIAL UNIT IS COMPLETED, THE COMPONENTS WILL BE BUILT TO SPECIFICATION. KEY COMPONENTS WILL THEN BE TESTED TO ENSURE THEY OPERATE AS INTENDED AND MEET PERFORMANCE REQUIREMENTS. IN THE SECOND YEAR, PERMITTING AND DESIGN FOR SITE PREPARATION WILL INITIALIZE. BUDGET PERIOD 3: SITE PREPARATION / INSTALLATION / COMMISSIONING AND STATION OPERATION: THE OBJECTIVE IN THIS PHASE IS TO CONDUCT FINAL COMMERCIAL SITE PREPARATION, INSTALLATION, AND COMMISSIONING OF THE MUDF H2 STATION EQUIPMENT, AND TO QUANTIFY COST AND TIME REDUCTIONS IN COMPARISON TO GEN 4 STATION. THE GH2 H70 DISPENSERS WILL BE VALIDATED TO APPLICABLE STANDARDS TO ENSURE THE J2601/5 FUELING PROTOCOL IS IMPLEMENTED CORRECTLY, AND THE MUDF H2 STATION WILL BE EVALUATED AGAINST THE FUELING PERFORMANCE OBJECTIVES. BUDGET PERIOD 4: STATION OPERATION: THE OBJECTIVES IN THIS PHASE ARE TO PROVE THE PERFORMANCE REQUIREMENTS AND OBJECTIVES FOR THE MUDF H2 STATION CAN BE MET UNDER REAL WORLD OPERATION BY COLLECTING, ANALYZING, AND QUANTIFYING THE REAL-WORLD OPERATIONAL AND FUELING DATA AGAINST THE METRICS. THE EXPECTED OUTCOME OF THIS PHASE IS THE PUBLICATION OF A COMPREHENSIVE REFERENCE STATION DESIGN AND THE PUBLICATION OF THE EXPANDED AND ENHANCED NREL H2FILLS AND TEA MODELS.$9,550,000
· FY2025 · Department of Energy