← LeaderboardsInvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Tampa Electric Company
$61,423,418
Total funding
2
Grants
Funding over time
peak $55.8M · FY2023–25$100M$75M$50M$25M$0
'23
'24
'25
Funding mix
By agency
DOE$61,423,418 · 2
By mechanism
—$61,423,418 · 2
Investigators at Tampa Electric Company
InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).
Rising Stars
First grant in the last 5 yrs
Not enough data
Emerging Leaders
6–10 yrs in
Not enough data
All-Time
Most funded here, all years
Not enough data
Largest grants
BIPARTISAN INFRASTRUCTURE LAW (BIL): POLK CARBON STORAGE COMPLEX
THIS PROJECT WILL ASSESS THE TECHNICAL AND COMMERCIAL FEASIBILITY OF DEVELOPING A CARBON DIOXIDE (CO2) STORAGE FACILITY NEAR TAMPA ELECTRIC COMPANY’S (TEC) POLK POWER STATION. ACTIVITIES IN THIS PROJECT ARE DESIGNED TO ADVANCE THE COMMERCIAL PROJECT FROM A SITE CHARACTERIZATION AND PERMITTING PHASE TO CONSTRUCTION AND TESTING/VALIDATION. SPECIFICALLY, THIS PROJECT WILL ADDRESS ANY GAPS IN TECHNICAL KNOWLEDGE, OBTAIN REQUIRED SURFACE AND SUBSURFACE PERMITS FOR CONSTRUCTION, AND GARNER STAKEHOLDER ACCEPTANCE TO ENHANCE THE PROJECT’S SOCIAL AND ECONOMIC VIABILITY. THE PROJECT OBJECTIVES ALIGN WITH OVERALL CARBONSAFE PROGRAM OBJECTIVES.$55,835,381
· FY2025 · Department of Energy
DE-FE0032224 - POLK POWER STATION NATURAL GAS COMBINED CYCLE CARBON CAPTURE FRONT-END ENGINEERING AND DESIGN STUDY
NEW AWARD$5,588,037
· FY2023 · Department of Energy