← LeaderboardsInvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Czero Inc
$2,997,410
Total funding
3
Grants
Funding over time
peak $3M · FY2021–23$5M$3.8M$2.5M$1.3M$0
'21
'22
'23
Funding mix
By agency
DOE$2,997,410 · 3
By mechanism
—$2,997,410 · 3
Investigators at Czero Inc
InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).
Rising Stars
First grant in the last 5 yrs
Not enough data
Emerging Leaders
6–10 yrs in
Not enough data
All-Time
Most funded here, all years
Not enough data
Largest grants
MOLTEN-SALT METHANE PYROLYSIS OPTIMIZATION THROUGH IN-SITU CARBON CHARACTERIZATION AND REACTOR DESIGN$1,997,532
· FY2021 · Department of Energy
BINARY CHLORIDE SALTS AS CATALYSTS FOR METHANE TO HYDROGEN AND GRAPHITIC POWDER$999,878
· FY2021 · Department of Energy
ADVANCED HIGH THROUGHPUT COMPRESSION SYSTEM FOR MEDIUM- AND HEAVY-DUTY TRANSPORTATION
THE OBJECTIVE OF THIS PROJECT IS TO BUILD AND TEST A NOVEL MODULAR HYDROGEN COMPRESSOR FEATURING HYDRAULIC ACTUATION WHICH WILL ADDRESS THE FLEXIBILITY, SCALABILITY, AND RELIABILITY CHALLENGES ASSOCIATED WITH HIGH-FLOW HYDROGEN FUELING STATIONS. AT THE PROJECT’S CONCLUSION A PROTOTYPE COMPRESSOR WILL BE DEMONSTRATED WITH THE CAPABILITY OF COMPRESSING HYDROGEN FROM 120 TO 875 BAR AT A RATE OF 2.5 KG/MIN (WITH A STRETCH GOAL OF 3.75 KG/MIN AT 1000 BAR). THE PROJECT WILL BE SEPARATED INTO TWO BUDGET PERIODS WITH THE FIRST PERIOD FOCUSING ON REFINEMENT OF THE BALANCE OF PLANT AND PREPARATION OF THE COMPRESSOR DESIGN, WHILE THE SECOND BUDGET PERIOD WILL ENTAIL CONSTRUCTING AND TESTING THE PROTOTYPE COMPRESSOR.$0
· FY2023 · Department of Energy