← LeaderboardsInvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Idom Inc
$2,911,594
Total funding
3
Grants
Funding over time
peak $2.6M · FY2021–22$5M$3.8M$2.5M$1.3M$0
'21
'22
Funding mix
By agency
DOE$2,911,594 · 3
By mechanism
—$2,911,594 · 3
Investigators at Idom Inc
InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).
Rising Stars
First grant in the last 5 yrs
Not enough data
Emerging Leaders
6–10 yrs in
Not enough data
All-Time
Most funded here, all years
Not enough data
Largest grants
MARMOK- OSCILLATING WATER COLUMN (OWC)$1,512,668
· FY2021 · Department of Energy
CURRENT TURBINES MOBILE TESTING VESSEL$1,059,618
· FY2021 · Department of Energy
THE PROJECT’S OVERALL GOAL IS TO DEVELOP IMPROVED HIGH-TEMPERATURE MOLTEN SALT TES TANK DESIGN METHODOLOGIES THAT WILL BECOME THE BASIS FOR THE FIRST DESIGN STANDARD FOR TES TANKS. THE OUTCOME OF THIS PROJECT WILL IMPROVE RELIABILITY OF THE TES SYSTEMS AND WILL LOWER THE COST OF UTILITY-SCALE CSP ELECTRICITY GENERATION.$339,308
· FY2022 · Department of Energy