GGrantIndex
← Leaderboards

Pioneer Energy Inc

Compare ↔
$23,118,204
Total funding
5
Grants

Funding over time

peak $22.9M · FY202125
$25M$18.8M$12.5M$6.3M$0
'21
'22
'23
'24
'25

Funding mix

By agency

DOE$23,118,204 · 5

By mechanism

$23,118,204 · 5

Investigators at Pioneer Energy Inc

InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).

Rising Stars

First grant in the last 5 yrs

Not enough data

Emerging Leaders

6–10 yrs in

Not enough data

All-Time

Most funded here, all years

Not enough data

Largest grants

INFLATION REDUCTION ACT (IRS) - ZERO-EMISSION SWEETENING & STABILIZATION PRODUCTION FACILITIES FOR SOUR SITES THE PROPOSED PROJECT AIMS TO ADVANCE THE EMISSION CONTROL TREATER (ECT) TECHNOLOGY TO A FULLY FUNCTIONAL COMMERCIALLY OPERATING PRODUCT (TRL 8) THAT ADDRESSES THE DESIGN AND OPERATIONAL CHALLENGES OF PROCESSING SOUR CRUDE AT SITES WITH ZERO EMISSIONS.$6,000,000
· FY2025 · Department of Energy
INFLATION REDUCTION ACT (IRA) - METHANE EMISSION MITIGATION THROUGH ONSITE METHANOL SYNTHESIS THE PROPOSED PROJECT AIMS TO UTILIZE WASTE GAS ON A WELLSITE AND CONVERT IT INTO METHANOL.$6,000,000
· FY2025 · Department of Energy
INNOVATIVE TECHNOLOGIES TO ELIMINATE FLARING FROM OIL AND NATURAL GAS PRODUCTION. THE OBJECTIVE OF THIS PROJECT IS TO CONTINUE DEVELOPMENT OF THE EMISSION CONTROL TREATER (ECT), A NEW WELL PAD PROCESSING TECHNOLOGY THAT USES A FUNDAMENTALLY DIFFERENT PROCESS TO ACHIEVE BETTER SEPARATION, REPLACING EXISTING EQUIPMENT WHILE ELIMINATING NEARLY ALL EMISSION SOURCES ON THE PAD. THE TECHNOLOGY REPLACES FIRED HEATER TREATERS THROUGH ELECTRIFICATION OR CONSOLIDATION TO A SINGLE FIRED HEATER WITH EMISSION CONTROLS, ELIMINATES TANK VAPORS THROUGH BETTER CRUDE STABILIZATION, REMOVES OR REDUCES THE NEED FOR INTERNAL COMBUSTION ENGINE DRIVEN COMPRESSION, AND IS A SIMPLER SKID-BASED PREFABRICATED PROCESS WHICH ELIMINATES MOST FUGITIVE EMISSIONS. THE MODULAR NATURE OF THE ECT ENABLES IMPROVED CAPITAL UTILIZATION THROUGH REDEPLOYMENT AS PRODUCTION CHANGES.$5,868,433
· FY2025 · Department of Energy
INFLATION REDUCTION ACT (IRA) – ZERO-EMISSION DROP-IN REPLACEMENT PRODUCTION FACILITIES FOR MARGINAL CONVENTIONAL WELLS THIS PROJECT SUPPORTS EFFORTS TO ADVANCE THE EMISSION CONTROL TREATER (ECT) TECHNOLOGY TO A FULLY FUNCTIONAL COMMERCIALLY OPERATING PRODUCT (TRL 8) THAT TARGETS WELLS THAT ARE, OR ARE ABOUT TO BE, MARGINAL CONVENTIONAL WELLS (MCWS). THIS WILL BE ACHIEVED BY SCALING DOWN THE DESIGN OF THE 500 BPD PILOT UNIT TO TARGET TWO SETS OF WELL SITES, THOSE PRODUCING AROUND 40 BARRELS OF OIL EQUIVALENT PER DAY (BOEPD) AND THOSE PRODUCING 20 BOEPD OR LESS. THESE UNITS WILL BE DESIGNED TO BE AS INEXPENSIVE AS POSSIBLE, INTENDED TO BE SMART, DROP-IN REPLACEMENTS FOR THE SURFACE INFRASTRUCTURE OF MCWS AND NEAR MCWS TO MITIGATE THE POTENTIAL FOR METHANE EMISSIONS COMPLETELY$5,000,000
· FY2025 · Department of Energy
RECYCLING TREATER FOR REDUCTION OF WELL SITE METHANE EMISSIONS AND INTEGRATED MISCIBLE EOR$249,771
· FY2021 · Department of Energy
Pioneer Energy Inc · GrantIndex