Quidnet Energy Inc

Compare ↔
$16,581,420
Total funding
4
Grants

Funding over time

peak $12.1M · FY201925
$20M$15M$10M$5M$0
'19
'20
'21
'22
'23
'24
'25

Funding mix

By agency

DOE$16,581,420 · 4

By mechanism

$16,581,420 · 4

Investigators at Quidnet Energy Inc

InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).

Rising Stars

First grant in the last 5 yrs

Not enough data

Emerging Leaders

6–10 yrs in

Not enough data

All-Time

Most funded here, all years

Not enough data

Largest grants

QUIDNET ENERGY INC CONTROL NUMBER 2641-1576 SCALEUP 2021 PROJECT TITLE: GEOMECHANICAL PUMPED STORAGE: THE PURPOSE OF THIS PROJECT IS TO ADVANCE QUIDNET ENERGY’S GEOMECHANICAL PUMPED STORAGE (GPS) FROM ITS CURRENT PILOT SCALE TO COMMERCIALLY RELEVANT MW-SCALE SYSTEMS BY INCREASING THE SIZE OF THE STORAGE LENS, IMPROVING LENS SEALING, AND COMMISSIONING THE FIRST GRID-CONNECTED SYSTEM. AMENDMENT 0001: THE PURPOSE OF THIS AMENDMENT IS TO CORRECT ATTACHMENT 1.$9,999,798
· FY2025 · Department of Energy
QUIDNET ENERGY, INC.: NEW DAYS AWARD. CONTROL NUMBER: 1906-1581 TITLE: ''GEOMECHANICAL PUMPED STORAGE'' NEW AWARD QUIDNET'S PROPOSED EFFORT IS TO DEVELOP A NOVEL ELECTRO-MECHANICAL POWER CONVERSION DEVICE TO ENABLE ULTRA-LOW COST GEOMECHANICAL PUMPED STORAGE FOR THE POWER GRID.$3,297,457
· FY2019 · Department of Energy
THE PROPOSED PROJECT IS A 30-MONTH PROGRAM LED BY QUIDNET ENERGY TO DEMONSTRATE THE COMMERCIAL FEASIBILITY OF RESERVOIR-BASED GEOMECHANICAL PUMPED STORAGE (GPS-R), AN INNOVATIVE FORM OF LONG-DURATION ENERGY STORAGE THAT IS MODULAR, UNTETHERED TO MOUNTAINOUS TERRAINS, FAST TO PERMIT, AND DEPLOYABLE AT A FRACTION OF THE CAPEX OF TRADITIONAL PUMPED STORAGE AND A LEVELIZED COST OF STORAGE COMPARABLE TO EXISTING NATURAL GAS POWER GENERATION. GPS-R ALSO STANDS OUT AMONG ENERGY STORAGE TECHNOLOGIES IN ITS ABILITY TO GENUINELY EMPLOY AND TRANSITION THE OIL AND GAS WORKFORCE. THE TWO PHASES OF THE PROPOSED WORK SCOPE COVER TWO BUDGET PERIODS AS OUTLINED BELOW. PHASE 1 (BUDGET PERIOD 1) – FIELD VALIDATION & COMMERCIAL FEASIBILITY • EXPECTED RESULTS: WELLS (AND ASSOCIATED LEASE), PERMITS AND APPROVALS SECURED. RESERVOIR PRODUCTIVITY DATA AND WELL TESTING DATA OBTAINED THROUGH FIELD TESTING. GPS-R RESERVOIR AND TEA MODEL DEVELOPED TO VALIDATE COMMERCIAL VIABILITY. • COMMUNITY BENEFITS PLAN RESULTS: RE-USE OF AN OLD OIL AND GAS WELL FOR TESTING, PROVIDING LEASING PAYMENTS TO ASSOCIATED LANDOWNERS, AND PUTTING OIL AND GAS WORKERS TO WORK TO EXECUTE FIELD TESTING. PHASE 2 (BUDGET PERIOD 2) – COMMERCIALIZATION PLANNING • EXPECTED RESULTS: GPS-R SYSTEM LEVEL DESIGN AND COSTING COMPLETED. NATIONAL GPS-R RESOURCE ASSESSMENT DELIVERED. PROJECT DEVELOPMENT PLAN GENERATED FOR A NEAR-TERM COMMERCIAL-DEMONSTRATION PROJECT. • COMMUNITY BENEFITS PLAN RESULTS: RESOURCE ESTIMATES IDENTIFIED WITHIN DISADVANTAGED COMMUNITIES AS PART OF NATIONAL GPS-R RESOURCE ASSESSMENT. SUCCESSFUL COMPLETION OF THE PROPOSED PROJECT WOULD DEMONSTRATE GPS-R IN REAL-WORLD FIELD ENVIRONMENTS AT 100+ KW HYDRAULIC CAPACITY FOR VARIOUS CYCLING DURATIONS, USE THOSE FIELD TEST RESULTS TO VALIDATE WELL PERFORMANCE ASSUMPTIONS AND INFORM COMMERCIAL-SCALE PROJECT ECONOMICS (TARGETING 10+% UNLEVERED INTERNAL RATE OF RETURN (IRR), AND IDENTIFY GRID-SCALE GPS-R RESOURCES IN THE US; ALL TOGETHER TO ENABLE FOLLOW-ON FINANCING FOR A FULL-SYSTEM COMMERCIAL DEMONSTRATION.$2,084,165
· FY2025 · Department of Energy
GEOMECHANICAL PUMPED STORAGE$1,200,000
· FY2019 · Department of Energy