GGrantIndex
← Leaderboards

Calstart, Inc.

Compare ↔
$13,760,837
Total funding
11
Grants

Funding over time

peak $4M · FY201125
$5M$3.8M$2.5M$1.3M$0
'11
'12
'13
'14
'15
'16
'17
'18
'19
'20
'21
'22
'23
'24
'25

Funding mix

By agency

DOE$13,760,837 · 11

By mechanism

$13,760,837 · 11

Investigators at Calstart, Inc.

InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).

Rising Stars

First grant in the last 5 yrs

Not enough data

Emerging Leaders

6–10 yrs in

Not enough data

All-Time

Most funded here, all years

Not enough data

Largest grants

NEW AWARD DE-EE0009867 WITH CALSTART, INC. TITLED CHARGE TO WORK USA$3,999,994
· FY2022 · Department of Energy
AWARD NUMBER DE-EE0008891 TO CALSTART, INC. FOR PROJECT TITLED MEDIUM AND HEAVY-DUTY ELECTRIC VEHICLE DEPLOYMENT – DATA COLLECTION$2,166,871
· FY2019 · Department of Energy
COLORADO CLEAN MOBILITY STRATEGIC PLANNING. THE RECIPIENT AND ITS PARTNERS WILL ENGAGE COMMUNITIES ACROSS COLORADO THAT FACE HIGHER OBSTACLES TO ZERO-EMISSION MOBILITY TO DEVELOP COMMUNITY-DRIVEN PLANS FOR MULTIMODAL, ZERO-EMISSION MOBILITY WITH A PATH TOWARD THEIR IMPLEMENTATION. THE RECIPIENT WILL SHARE RESULTS AND LESSONS LEARNED THAT DEMONSTRATE PATHWAYS TO EQUITABLE ACCESS AND DEPLOYMENT OF ZERO-EMISSION MOBILITY FOR OTHER UNDERSERVED AND DISADVANTAGED COMMUNITIES IN COLORADO AND ACROSS THE US.$1,778,100
· FY2023 · Department of Energy
THE RECIPIENT WILL SUPPORT A REGIONAL EFFORT TO EXPAND PUBLIC INVESTMENT IN ELECTRIC VEHICLE (EV) MOBILITY PROGRAMS AND NEIGHBORHOOD-SPECIFIC INFRASTRUCTURE FOR DISADVANTAGED AND LOW-INCOME COMMUNITIES IN SACRAMENTO, CALIFORNIA. THIS PROJECT WILL CREATE THREE MOBILITY HUBS AND STUDY THEIR ABILITY TO SERVE AS A BASE FOR EV CARSHARE, COMMUNITY CHARGING, AND ACCESS TO ON-DEMAND SHUTTLE SERVICES.$1,499,693
· FY2025 · Department of Energy
EAST COAST COMMERCIAL ZERO-EMISSIONS VEHICLE (ZEV) CORRIDOR PLANNING PARTNERSHIP. THIS PROJECT WILL DEVELOP A REPLICABLE REGIONAL COMMERCIAL ZEV CORRIDOR INFRASTRUCTURE DEPLOYMENT PLAN TO ACCELERATE FREIGHT DECARBONIZATION BY LOWERING THE TOTAL COST OF FREIGHT PER MILE BY GUIDING THE DESIGN, LOCATION, AND SCALING OF RELIABLE CHARGING AND HYDROGEN FUELING INFRASTRUCTURE IN THE RIGHT WAY, AT THE RIGHT PLACES, AND RIGHT TIMES. THE STRATEGIC PLANNING EFFORT WILL SPUR THE DEPLOYMENT OF COMMERCIAL MEDIUM- AND HEAVY-DUTY (MHD) ZEV INFRASTRUCTURE THROUGH THE DEVELOPMENT OF AN EAST COAST COMMERCIAL ZEV CORRIDOR.$1,250,000
· FY2023 · Department of Energy
ZERO-EMISSION TRUCK ROADSHOW. THE OBJECTIVE OF THE ZERO-EMISSION TRUCK ROADSHOW IS TO FAMILIARIZE FLEET OWNERS AND MANAGERS IN DISADVANTAGED COMMUNITIES WITH ZERO-EMISSION TRUCKS BY HOSTING SIX TEST DRIVE EVENTS ACROSS THE U.S. AT EACH EVENT, 150 ATTENDEES SHALL EXPERIENCE 10 ZERO-EMISSION TRUCKS, LEARN ABOUT INCENTIVES, TOTAL COST OF OWNERSHIP, AND CHARGING INFRASTRUCTURE AND BE ENCOURAGED TO DECARBONIZE TRANSPORTATION AND CONSIDER HOW THESE TRUCKS CAN BEST INTEGRATE INTO THEIR FLEETS. BASED ON LESSONS LEARNED, A ZERO-EMISSION TRUCK ROADSHOW TOOLKIT SHALL BE DEVELOPED FOR CLEAN CITIES ORGANIZATIONS ACROSS THE U.S. TO DUPLICATE THIS EFFORT.$998,772
· FY2025 · Department of Energy
INNOVATIVE DUAL FUEL AFTERMARKET EMISSIONS SOLUTION$992,102
· FY2017 · Department of Energy
INCREASING NATIONWIDE ZEV ADOPTION - ENHANCED JOINT PROCUREMENT PROCESS FOR PUBLIC FLEETS$726,298
· FY2017 · Department of Energy
BI-DIRECTIONAL WIRELESS POWER FLOW FOR MEDIUM DUTY VEHICLE GRID CONNECTIVITY$349,007
· FY2017 · Department of Energy
DE-FC26-06NT43006 JUMPSTARTING THE NATION'S HIGHEST POTENTIAL E-85 REFUELING NETWORK: A PROPOSAL TO BUILD A RENEWALBE ROADWAY IN CALIFORNIA , AMENDME$0
· FY2011 · Department of Energy
NATIONAL HYBRID TRUCK MANUFACTURING PROGRAM$0
· FY2012 · Department of Energy