← LeaderboardsInvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Agua Caliente Band Of Cahuilla Indians
$4,671,247
Total funding
4
Grants
Funding over time
peak $4.2M · FY2010–25$5M$3.8M$2.5M$1.3M$0
'10
'11
'12
'13
'14
'15
'16
'17
'18
'19
'20
'21
'22
'23
'24
'25
Funding mix
By agency
DOE$4,671,247 · 4
By mechanism
—$4,671,247 · 4
Investigators at Agua Caliente Band Of Cahuilla Indians
InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).
Rising Stars
First grant in the last 5 yrs
Not enough data
Emerging Leaders
6–10 yrs in
Not enough data
All-Time
Most funded here, all years
Not enough data
Largest grants
THE AGUA CALIENTE BAND OF CAHUILLA INDIANS (THE “TRIBE”) WILL INSTALL, OPERATE, AND MONITOR SOLAR PV (PHOTOVOLTAIC) ARRAYS AND ENERGY STORAGE PROJECTS ON ESSENTIAL TRIBAL FACILITIES. THIS PROJECT WILL INSTALL APPROXIMATELY 880-KW (KILOWATTS) OF SOLAR PHOTOVOLTAIC SYSTEMS, INSTALL APPROXIMATELY 918-KWH (KILOWATT HOURS) OF BATTERY ENERGY STORAGE SYSTEMS (BESS) AND RESULT IN AN APPROXIMATE SAVINGS OF APPROXIMATELY $8.73 MILLION OVER THE LIFE OF THE SYSTEM.
SYSTEMS WILL BE INTERCONNECTED WITH THE SOUTHERN CALIFORNIA EDISON UTILITY (SCE) GRID WILL BE UNDER THE CURRENT STATE OF CALIFORNIA NET ENERGY METERING 3.0 PLAN FOR ALL INTERCONNECTION POINTS.$4,240,947
· FY2025 · Department of Energy
AGUA CALIENTE WIND SOLAR PROJECT AT WHITEWATER RANCH$183,075
· FY2012 · Department of Energy
TAS::89 0321::TAS AGUA CALIENTE SOLAR FEASIBILITY & PRE-DEVELOPMENT STUDY$127,225
· FY2010 · Department of Energy
HERITAGE PLAZA PARKING LOTS IMPROVEMENT PROJECT - SOLAR PV INSTALLATION$120,000
· FY2017 · Department of Energy