← LeaderboardsInvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Avista Corporation
$21,214,120
Total funding
3
Grants
Funding over time
peak $20M · FY2010–25$20M$15M$10M$5M$0
'10
'11
'12
'13
'14
'15
'16
'17
'18
'19
'20
'21
'22
'23
'24
'25
Funding mix
By agency
DOE$21,214,120 · 3
By mechanism
—$21,214,120 · 3
Investigators at Avista Corporation
InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).
Rising Stars
First grant in the last 5 yrs
Not enough data
Emerging Leaders
6–10 yrs in
Not enough data
All-Time
Most funded here, all years
Not enough data
Largest grants
TAS::89 0328::TAS RECOVERY 09-0215: THIS PROJECT CONSISTS OF A NEW CENTRALIZED DMS WITH CONTROLS AT EACH SUBSTATION TO MEASURE THE USAGE AND PERFO$20,000,000
· FY2010 · Department of Energy
THE KEY OBJECTIVE OF THIS PROJECT IS EVALUATE THE BENEFITS OF GREATER COORDINATION BETWEEN MIDDLE COLUMBIA (MID-C) HYDROPOWER (HYDRO) FACILITY OWNERS AND OPERATORS (PARTICIPANTS), WITH AND WITHOUT THE PROPOSED BANKS LAKE PUMP-HYDRO PROJECT (BLPH) AT BANKS LAKE. THE OUTPUT WILL INCLUDE A DETAILED DATABASE OF THE MID-COLUMBIA RIVER PROJECT OPERATIONS THAT CAN BE OFFERED, ALONG WITH AN INSTANCE OF THE ADSS SOFTWARE PACKAGE, EITHER TO A NEW COOPERATIVE ORGANIZATION OF THE PARTIES INTERESTED IN COORDINATION OR POTENTIALLY TO AN EXISTING ENTITY OFFERING SIMILAR SERVICES, SUCH AS THE WESTERN POWER POOL.$914,120
· FY2025 · Department of Energy
AVISTA: DNFA AWARD.
TITLE: ''CYBER PHYSICAL SITUATIONAL AWARENESS (CYPSA)''
----------$300,000
· FY2018 · Department of Energy