← LeaderboardsInvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Dehlsen Associates, Llc
$13,153,646
Total funding
8
Grants
Funding over time
peak $8.4M · FY2010–22$10M$7.5M$5M$2.5M$0
'10
'11
'12
'13
'14
'15
'16
'17
'18
'19
'20
'21
'22
Funding mix
By agency
DOE$13,153,646 · 8
By mechanism
—$13,153,646 · 8
Investigators at Dehlsen Associates, Llc
InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).
Rising Stars
First grant in the last 5 yrs
Not enough data
Emerging Leaders
6–10 yrs in
Not enough data
All-Time
Most funded here, all years
Not enough data
Largest grants
TAS::89 0321::TAS AQUANTIS C-PLANE OCEAN CURRENT TURBINE PROJECT$3,600,000
· FY2010 · Department of Energy
TAS::89 0227::TAS RECOVERY; NEW PHASE I SBIR: RECOVERY ACT; TITLE: RECOVERY ACT - CENTIPOD WAVE ENERGY CONVERTER; PI: ALEXANDER FLEMING$2,150,000
· FY2010 · Department of Energy
AQUANTIS 2.5MW OCEAN CURRENT GENERATION DEVICE$2,024,968
· FY2010 · Department of Energy
SYSTEM AGNOSTIC SWITCHED RELUCTANCE LINEAR GENERATOR FOR WECS$1,879,439
· FY2017 · Department of Energy
ADVANCING WAVE ENERGY TECHNOLOGIES THROUGH OPEN WATER TESTING AT PACWAVE
DEHLSEN WILL PRODUCE THE FINAL DESIGN OF THEIR WAVE ENERGY CONVERTER - “CENTIPOD 1P6” FOR MANUFACTURING AND DEPLOYMENT AT PACWAVE. THE “CENTIPOD 1P6” (C1P6) IS A POINT ABSORBER WAVE ENERGY CONVERTER (WEC) COMPRISED OF A SINGLE 6M DIAMETER, SURFACE PIERCING, HEAVING PRIME MOVER “POD”, ATTACHED TO A LINEAR ACTING POWER TAKE-OFF (PTO) WITHIN A HOUSING SPAR AND A SUBMERGED, STABLE REFERENCE BUOYANCY “BACKBONE”, MOORED WITH PRE-TENSIONED LINES. IN THIS MANNER THE DEVICE IS INTERNALLY SELF-REACTING BUT ALSO GROUND REFERENCED, TO AN EXTENT. A FUNDAMENTAL PRINCIPLE OF THE WEC IS UTILIZING A LIGHT-WEIGHT PRIME MOVER AND ACTIVE CONTROL TO ACHIEVE TUNING TO THE INCIDENT SEASTATES AND HIGHLY EFFICIENT WAVE POWER CONVERSION. THIS IS VIEWED AS BEING THE MOST COST-EFFECTIVE ROUTE FOR WAVE POWER EXTRACTION (COMPARE WITH THE LARGE MASS PRIME MOVERS REQUIRED FOR MORE PASSIVE TUNING AND THE ENSUING HIGH CAPITAL COSTS AND IMPEDIMENT TO MARINE OPERATIONS, MOORING SYSTEM FORCES AND SO ON) AND GIVES THE HIGHEST PROBABILITY OF MINIMIZING SYSTEM LEVELIZED COST OF ENERGY.$1,800,000
· FY2022 · Department of Energy
SITING STUDY FOR A HYDROKINETIC ENERGY PROJECT LOCATED OFFSHORE SOUTHEAST FLORIDA$600,000
· FY2010 · Department of Energy
MARINE AND HYDROKINETIC TOUGH$599,239
· FY2017 · Department of Energy
ADVANCED CONTROLS FOR THE MULTI-POD CENTIPOD WEC DEVICE$500,000
· FY2014 · Department of Energy