GGrantIndex
← Leaderboards

Dehlsen Associates, Llc

Compare ↔
$13,153,646
Total funding
8
Grants

Funding over time

peak $8.4M · FY201022
$10M$7.5M$5M$2.5M$0
'10
'11
'12
'13
'14
'15
'16
'17
'18
'19
'20
'21
'22

Funding mix

By agency

DOE$13,153,646 · 8

By mechanism

$13,153,646 · 8

Investigators at Dehlsen Associates, Llc

InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).

Rising Stars

First grant in the last 5 yrs

Not enough data

Emerging Leaders

6–10 yrs in

Not enough data

All-Time

Most funded here, all years

Not enough data

Largest grants

TAS::89 0321::TAS AQUANTIS C-PLANE OCEAN CURRENT TURBINE PROJECT$3,600,000
· FY2010 · Department of Energy
TAS::89 0227::TAS RECOVERY; NEW PHASE I SBIR: RECOVERY ACT; TITLE: RECOVERY ACT - CENTIPOD WAVE ENERGY CONVERTER; PI: ALEXANDER FLEMING$2,150,000
· FY2010 · Department of Energy
AQUANTIS 2.5MW OCEAN CURRENT GENERATION DEVICE$2,024,968
· FY2010 · Department of Energy
SYSTEM AGNOSTIC SWITCHED RELUCTANCE LINEAR GENERATOR FOR WECS$1,879,439
· FY2017 · Department of Energy
ADVANCING WAVE ENERGY TECHNOLOGIES THROUGH OPEN WATER TESTING AT PACWAVE DEHLSEN WILL PRODUCE THE FINAL DESIGN OF THEIR WAVE ENERGY CONVERTER - “CENTIPOD 1P6” FOR MANUFACTURING AND DEPLOYMENT AT PACWAVE. THE “CENTIPOD 1P6” (C1P6) IS A POINT ABSORBER WAVE ENERGY CONVERTER (WEC) COMPRISED OF A SINGLE 6M DIAMETER, SURFACE PIERCING, HEAVING PRIME MOVER “POD”, ATTACHED TO A LINEAR ACTING POWER TAKE-OFF (PTO) WITHIN A HOUSING SPAR AND A SUBMERGED, STABLE REFERENCE BUOYANCY “BACKBONE”, MOORED WITH PRE-TENSIONED LINES. IN THIS MANNER THE DEVICE IS INTERNALLY SELF-REACTING BUT ALSO GROUND REFERENCED, TO AN EXTENT. A FUNDAMENTAL PRINCIPLE OF THE WEC IS UTILIZING A LIGHT-WEIGHT PRIME MOVER AND ACTIVE CONTROL TO ACHIEVE TUNING TO THE INCIDENT SEASTATES AND HIGHLY EFFICIENT WAVE POWER CONVERSION. THIS IS VIEWED AS BEING THE MOST COST-EFFECTIVE ROUTE FOR WAVE POWER EXTRACTION (COMPARE WITH THE LARGE MASS PRIME MOVERS REQUIRED FOR MORE PASSIVE TUNING AND THE ENSUING HIGH CAPITAL COSTS AND IMPEDIMENT TO MARINE OPERATIONS, MOORING SYSTEM FORCES AND SO ON) AND GIVES THE HIGHEST PROBABILITY OF MINIMIZING SYSTEM LEVELIZED COST OF ENERGY.$1,800,000
· FY2022 · Department of Energy
SITING STUDY FOR A HYDROKINETIC ENERGY PROJECT LOCATED OFFSHORE SOUTHEAST FLORIDA$600,000
· FY2010 · Department of Energy
MARINE AND HYDROKINETIC TOUGH$599,239
· FY2017 · Department of Energy
ADVANCED CONTROLS FOR THE MULTI-POD CENTIPOD WEC DEVICE$500,000
· FY2014 · Department of Energy