Ocean Renewable Power Co Inc
$37,357,022
Total funding
13
Grants
Funding over time
peak $17.5M · FY2010–25$20M$15M$10M$5M$0
'10
'11
'12
'13
'14
'15
'16
'17
'18
'19
'20
'21
'22
'23
'24
'25
Funding mix
By agency
DOE$37,357,022 · 13
By mechanism
—$37,357,022 · 13
Investigators at Ocean Renewable Power Co Inc
InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).
Rising Stars
First grant in the last 5 yrs
Not enough data
Emerging Leaders
6–10 yrs in
Not enough data
All-Time
Most funded here, all years
Not enough data
Largest grants
OCEAN RENEWABLE POWER COMPANY (ORPC) PROPOSES DEVELOPMENT OF A NEW PROJECT SITE LOCATED IN COOK INLET
WATERS, OFF EAST FORELAND, KENAI
PENINSULA BOROUGH, ALASKA (AK) AS THE LOCATION TO ACCELERATE THE COMMERCIAL SCALE TIDAL ENERGY INDUSTRY
IN THE US. WITH A TIDAL RANGE OF ABOUT 21 FT (6.4 M), EAST FORELAND HAS THE HIGHEST POTENTIAL FOR TIDAL
ENERGY DEVELOPMENT IN THE UNITED STATES. THE AMERICAN TIDAL ENERGY PROJECT AIMS TO DEVELOP A 1-5MW TIDAL
PILOT SITE TO INTEGRATE THE BEST TIDAL TECHNOLOGIES TO PROVIDE POWER TO THE GRID, INVOLVING THE
COMMUNITY AND ENVIRONMENTAL STAKEHOLDERS IN THE VISION FOR, AND IMPLEMENTATION OF, A COMMERCIAL TIDAL
ENERGY PROJECT BEYOND THE FUNDING PERIOD. IN PHASE/BUDGET PERIOD (BP) 1, THE PROJECT TEAM WILL
CHARACTERIZE THE SITE INCLUDING TIDAL RESOURCE DATA COLLECTION, FACILITY AND OR INFRASTRUCTURE ACCESS
AGREEMENTS, STAKEHOLDER ENGAGEMENT MAPPING AND CONSULTATION. TASKS WILL INVOLVE COLLECTION AND ANALYSIS
OF DESKTOP DATA WITH A POTENTIAL NEED FOR ADDITIONAL PHYSICAL DATA GATHERING. WORK IN THIS PHASE WILL
INFORM AND UNDERSTAND THE INTERACTIONS BETWEEN THE OFFSHORE ENVIRONMENT AND CANDIDATE TECHNOLOGIES.
PLANS AND SCHEDULES WILL BE CREATED FOR LICENSING AND ENVIRONMENTAL MONITORING, SITE HEALTH AND SAFETY,
SITE COMMERCIALIZATION, STAKEHOLDER ENGAGEMENT INCLUDING POTENTIAL TRIBAL PARTNERS, COMMUNITY BENEFITS
INCLUDING ESTIMATION OF CLEAN ENERGY JOBS CREATED, SUPPLY CHAIN PROCUREMENT AND TECHNOLOGY SELECTION AND
QUALIFICATION. THIS PHASE WILL CULMINATE IN A FEDERAL ENERGY REGULATORY COMMISSION (FERC) DRAFT
HYDROKINETIC PILOT PROJECT LICENSE APPLICATION SUBMISSION.
A COMPETITIVE DOWN-SELECT WILL BE HELD AT THE CONCLUSION OF PHASE 1/BP1 WHERE THE PROJECT TEAM WILL
PRESENT THE PROJECT GOALS, PROGRESS, AND ACCOMPLISHMENTS TO-DATE TO THE WATER POWER TECHNOLOGIES OFFICE
(WPTO). IF THIS PROJECT IS SELECTED, SUBSEQUENT PHASES WILL BE AS FOLLOWS:
- PHASE 2: DETAILED SITE CHARACTERIZATION
- PHASE 3: SITE MOBILIZATION
- PHASE 4: SITE COMMISSIONING AND TECHNOLOGY FABRICATION
- PHASE 5: TESTING AND OPERATIONS$17,500,000
· FY2025 · Department of Energy
MODULAR RIVGEN$3,875,859
· FY2021 · Department of Energy
OCEAN RENEWABLE POWER COMPANY, INC.: NEW SHARKS SBIR/STTR AWARD.
CONTROL NUMBER: 2335-1515
PROJECT TITLE: OPTIMIZED HYDROKINETIC SYSTEMS
OCEAN RENEWABLE POWER COMPANY, INC. PROPOSES TO IDENTIFY DESIGN COUPLINGS BETWEEN SUBSYSTEMS AND COMPONENTS TO OPTIMIZE SYSTEM MASS AND PERFORMANCE.$3,576,987
· FY2021 · Department of Energy
POWER TAKE-OFF SYSTEM FOR MARINE RENEWABLE DEVICES$2,875,011
· FY2014 · Department of Energy
DEPLOYMENT AND RETRIEVAL SYSTEM FOR CROSS-FLOW HYDROKINETIC TURBINES$2,457,219
· FY2017 · Department of Energy
ADVANCED ENERGY HARVESTING CONTROL SCHEMES FOR MARINE RENEWABLE ENERGY DEVICES$1,727,670
· FY2014 · Department of Energy
TAS::89 0227::TAS RECOVERY; NEW PHASE I STTR: RECOVERY ACT; TITLE: RECOVERY ACT - REFINEMENT OF CROSS FLOW TURBINE AIRFOILS; PI: JARLATH MCENTEE$1,650,000
· FY2010 · Department of Energy
TAS::89 0321::TAS OCGEN MODULE MOORING PROJECT$1,373,536
· FY2010 · Department of Energy
HYDROKINETIC BASELOAD MICROGRIDS$1,291,037
· FY2019 · Department of Energy
DESIGN OF HIGH-DEFLECTION FOILS FOR MHK APPLICATIONS$571,699
· FY2018 · Department of Energy
POWER FOR SUBSEA NETWORKS$160,316
· FY2021 · Department of Energy
LOW MASS, MODULAR, RIVER HYDROKINETIC SYSTEM$149,331
· FY2017 · Department of Energy
UPPER COOK INLET ELECTROFUELS$148,357
· FY2022 · Department of Energy