← LeaderboardsInvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Makai Ocean Engineering Inc
$5,652,098
Total funding
8
Grants
Funding over time
peak $3.5M · FY2009–23$5M$3.8M$2.5M$1.3M$0
'09
'10
'11
'12
'13
'14
'15
'16
'17
'18
'19
'20
'21
'22
'23
Funding mix
By agency
DOE$5,652,098 · 8
By mechanism
—$5,652,098 · 8
Investigators at Makai Ocean Engineering Inc
InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).
Rising Stars
First grant in the last 5 yrs
Not enough data
Emerging Leaders
6–10 yrs in
Not enough data
All-Time
Most funded here, all years
Not enough data
Largest grants
MAKAI OCEAN ENGINEERING, INC.
CONTROL:2459-2759
NEW AWARD
''REMOTELY INSTALLED ANCHORAGES FOR FLOATING OFFSHORE WIND AND OTHER OFFSHORE RENEWABLES COST REDUCTION''
DE-FOA-0002459, OPEN 2021$2,105,454
· FY2022 · Department of Energy
AUTOMATED WIND TRANSMISSION ROUTING AND COSTING TOOL$1,349,678
· FY2022 · Department of Energy
MAKAI OCEAN ENGINEERING, INC.: NEW MARINER AWARD.
CONTROL NUMBER: 1726-1565
TITLE: ''PREDICTING THE PERFORMANCE OF MACROALGAE FARMS WITH HYDRODYNAMIC AND BIOLOGICAL MODELING''$995,978
· FY2018 · Department of Energy
COST EFFECTIVE PRIMARY HEAT EXCHNAGER FOR GEN3 CSP SYSTEMS
A. PROJECT OBJECTIVES
THE GOAL OF THIS PROJECT IS TO DEVELOP A HIGH TEMPERATURE HIGH PRESSURE (HTHP) HEAT EXCHANGER BASED ON MAKAI’S THIN-FOIL HEAT EXCHANGER (TFHX) TECHNOLOGY FOR THE PURPOSES OF MEETING DOE SUNSHOT COST TARGETS FOR THE PRIMARY HEAT EXCHANGER IN A PARTICLE-TO-SCO2 GEN3 CSP SYSTEM AND ENABLING COMMERCIALIZATION OF GEN3 CSP.$449,770
· FY2023 · Department of Energy
TAS::89 0321::TAS MODELING THE PHYSICAL AND BIOCHEMICAL INFLUENCE OF OCEAN THERMAL ENERGY CONVERSION PLANT DISCHARGES INTO THEIR ADJACENT WATERS$202,388
· FY2010 · Department of Energy
COMPACT HEAT EXCHANGER FOR THE STRINGENT OPERATING CONDITIONS OF GEN3 CSP SYSTEMS$199,441
· FY2021 · Department of Energy
NEW SBIR PHASE I 2009; TITLE: ELECTRICAL TRANSMISSION CABLE TO SHORE FOR A 100MW FLOATING OTEC ELECTRICAL POWER PLANT; PI: JOSEPH VANRYZIN$199,396
· FY2009 · Department of Energy
TAS::89 0227::TAS RECOVERY; NEW PHASE I SBIR: RECOVERY ACT; TITLE: RECOVERY ACT - CONCEPTUAL DESIGN AND MODELING OF AN OFFSHORE 100MW MIST LIFT OPEN$149,993
· FY2010 · Department of Energy