← LeaderboardsInvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Aspen Products Group Inc
$5,257,425
Total funding
6
Grants
Funding over time
peak $1.7M · FY2008–22$2M$1.5M$1M$500K$0
'08
'09
'10
'11
'12
'13
'14
'15
'16
'17
'18
'19
'20
'21
'22
Funding mix
By agency
DOE$5,257,425 · 6
By mechanism
—$5,257,425 · 6
Investigators at Aspen Products Group Inc
InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).
Rising Stars
First grant in the last 5 yrs
Not enough data
Emerging Leaders
6–10 yrs in
Not enough data
All-Time
Most funded here, all years
Not enough data
Largest grants
LOW-COST ENERGY RECOVERY VENTILATOR INCORPORATING A HIGH FLUX MOISTURE-PERMEABLE MEMBRANE$1,654,952
· FY2017 · Department of Energy
SBIR-PHASE I NEW; THERMALLY STABLE HYBRID MEMBRANES FOR CO2 SEPARATION; DECIO COUTINHO$1,299,997
· FY2012 · Department of Energy
ASPEN PRODUCTS GROUP, INC. NEW HESTIA SBIR AWARD
CONTROL NUMBER: 2626-1508
TITLE: HIGH PERFORMANCE, CARBON NEGATIVE, BUILDING INSULATION
A SUSTAINABLE, HIGH-PERFORMANCE, THERMAL INSULATION THAT IMPROVES THE ENERGY-EFFICIENCY OF BUILDINGS AND REDUCES GREENHOUSE GAS EMISSIONS BY INCORPORATING ATMOSPHERIC CARBON DIOXIDE INTO THE INSULATION’S STRUCTURE WILL BE DEVELOPED IN THE PROPOSED EFFORT. THE PROGRAM WILL FOCUS ON CELLULOSIC RAW MATERIALS SOURCING AND PROCESSING, INSULATION CHEMISTRY OPTIMIZATION, MANUFACTURING PROCESS DEVELOPMENT, INSULATION PRODUCT TESTING, AND PROCESS AND LIFE CYCLE ANALYSIS MODELING IN ORDER TO ULTIMATELY DEMONSTRATE BOTH AN INSULATION PRODUCT THAT MEETS CONSTRUCTION MARKET TECHNICAL PERFORMANCE REQUIREMENTS AND A PROCESS THROUGH WHICH THE INSULATION MAY BE COST-EFFECTIVELY MANUFACTURED.$1,152,476
· FY2022 · Department of Energy
ROBUST, LOW COST MEMBRANES FOR HYDROGEN PRODUCTION FROM COAL DERIVED SYNGAS$850,000
· FY2008 · Department of Energy
PERMSELECTIVE MEMBRANE FOR SEPARATION OF AROMATIC-ALIPHATIC MIXTURES$150,000
· FY2012 · Department of Energy
NANOSTRUCTURED CO2 SEPARATION MEMBRANE FOR COST-EFFECTIVE CARBON CAPTURE$150,000
· FY2015 · Department of Energy