← LeaderboardsInvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Euclid Techlabs, Llc
$44,109,372
Total funding
64
Grants
Funding over time
peak $8.6M · FY2008–25$10M$7.5M$5M$2.5M$0
'08
'09
'10
'11
'12
'13
'14
'15
'16
'17
'18
'19
'20
'21
'22
'23
'24
'25
Funding mix
By agency
DOE$44,109,372 · 64
By mechanism
—$44,109,372 · 64
Investigators at Euclid Techlabs, Llc
InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).
Rising Stars
First grant in the last 5 yrs
Not enough data
Emerging Leaders
6–10 yrs in
Not enough data
All-Time
Most funded here, all years
Not enough data
Largest grants
NEW SBIR PHASE I 2009: A NEW QUARTER-WAVE COAXIAL COUPLER FOR 1.3 GHZ SUPERCONDUCTING CAVITY; PI - ALEX KANAREYKIN$2,199,332
· FY2009 · Department of Energy
GHZ ELECTRON BUNCHER COMPATIBLE WITH COMMERCIAL TEMS FOR STROBOSCOPIC IMAGING WITH SPACE-TIME RESOLUTION BETWEEN 10-23 AND 10-20 M S (TOPIC 7A)$2,149,705
· FY2015 · Department of Energy
LOW RF LOSS DC CONDUCTIVE CERAMIC FOR HIGH POWER INPUT COUPLER WINDOWS FOR SRF CAVITIES$2,144,397
· FY2017 · Department of Energy
SINGLE CRYSTAL DIAMOND COMPOUND REFRACTIVE LENSES$1,948,155
· FY2015 · Department of Energy
TAS::89 0222::TAS NEW PHASE I SBIR; TITLE:$1,698,278
· FY2010 · Department of Energy
TAS::89 0222::TAS NEW PHASE I SBIR; TITLE: DEVELOPMENT OF A DIELECTRIC-BASED SHORT RF PULSE TWO BEAM ACCELERATOR PROTOTYPE MODULE; PI: CHUNGUANG J$1,644,745
· FY2010 · Department of Energy
DEVELOPMENT OF THE ADVANCED MPE CVD SYSTEM FOR GROWTH OF LARGE DIFFRACTION GRADE SINGLE-CRYSTAL DIAMONDS WITH THE EXCEPTIONALLY LOW DENSITY OF DEFECTS$1,376,239
· FY2020 · Department of Energy
SBIR-PHASE I NEW; A NEW CONICAL HALF-WAVE SUPERCONDUCTING CAVITY; ALEX KANAREYKIN$1,299,320
· FY2012 · Department of Energy
SBIR-PHASE I NEW; CHIRPED ELECTRON BUNCH ENERGY COMPENSATION FOR AN X-RAY LIGHT SOURCE; ALEX KANAREYKIN$1,299,022
· FY2012 · Department of Energy
SBIR-PHASE I NEW; HIGH POWER RF TESTING OF A 3-CELL SUPERCONDUCTING TRAVELING WAVE ACCELERATING STRUCTURE; ALEX KANAREYKIN$1,298,178
· FY2012 · Department of Energy
SBIR-PHASE I NEW; HIGH GRADIENT TEST OF A STANDING WAVE DIELECTRIC LOADED ACCELERATING STRUCTURE; CHUNGUANG JING$1,294,388
· FY2012 · Department of Energy
PHASE CORRECTION PLATES FOR X-RAYS$1,197,740
· FY2018 · Department of Energy
ULTRA-HIGH GRADIENT TRAVELLING-WAVE GUN$1,189,109
· FY2018 · Department of Energy
IMPROVED CAPILLARY GUIDED LASER WAKEFIELD ACCELERATORS BASED ON DIAMOND MATERIALS$1,149,904
· FY2012 · Department of Energy
FLAT FIELD EMITTER BASED ON ULTRANANOCRYSTALLINE DIAMOND (UNCD) FILM FOR SRF TECHNOLOGY$1,149,822
· FY2015 · Department of Energy
COLD SPRAY TECHNOLOGY APPLICATIONS FOR SRF CAVITY THERMAL AND MECHANICAL STABILIZATION$1,149,545
· FY2019 · Department of Energy
POWER TUNABLE HIGH AND NARROWBAND THZ SOURCE FOR THZ PUMP X-RAY PROBE EXPERIMENTS$1,149,356
· FY2013 · Department of Energy
A COST-EFFECTIVE HIGH-CONFIGURABLE IRIS DIAPHRAGM BEAM HALO DETECTOR$1,149,310
· FY2019 · Department of Energy
INEXPENSIVE ELECTRON BEAM OPTICS FOR ULTRAFAST ELECTRON MICROSCOPY$1,147,431
· FY2018 · Department of Energy
INEXPENSIVE BRAZELESS MEDICAL ACCELERATOR$1,146,743
· FY2017 · Department of Energy