← LeaderboardsInvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Babcock & Wilcox Co
$16,616,111
Total funding
10
Grants
Funding over time
peak $6M · FY2008–18$10M$7.5M$5M$2.5M$0
'08
'09
'10
'11
'12
'13
'14
'15
'16
'17
'18
Funding mix
By agency
DOE$16,616,111 · 10
By mechanism
—$16,616,111 · 10
Investigators at Babcock & Wilcox Co
InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).
Rising Stars
First grant in the last 5 yrs
Not enough data
Emerging Leaders
6–10 yrs in
Not enough data
All-Time
Most funded here, all years
Not enough data
Largest grants
COMMERCIALIZATION OF THE IRON BASE COAL DIRECT CHEMICAL LOOPING PROCESS FOR POWER PRODUCTION WITH INSTITUTE CARBON DIOXIDE CAPTURE$4,743,926
· FY2012 · Department of Energy
10 MEGAWATTS ELECTRIC COAL DIRECT CHEMICAL LOOPING LARGE PILOT PLANT - PRE-FRONT END ENGINEERING AND DESIGN STUDY$3,289,925
· FY2017 · Department of Energy
DEVELOPMENT OF COST EFFECTIVE OXY-COMBUSTION RETROFITTING COAL-FIRED BOILERS$2,581,591
· FY2008 · Department of Energy
NEW AGREEMENT: DEVELOPMENT OF COMPUTATIONAL CAPABILITIES TO PREDICT THE CORROSION WASTAGE OF BOILER TUBES IN ADVANCED COMBUSTION SYSTEMS$1,813,543
· FY2008 · Department of Energy
BP2 CONTINUATION APPROVAL; INCREMENTAL FUNDING; RECOGNIZE CARRYOVER FROM BP1$1,596,079
· FY2009 · Department of Energy
DE-FE0007716, BASE AWARD, PROJECT TITLE: OPTIMIZED SOLVENT FOR ENERGY-EFFICIENT, ENVIRONMENTALLY-FRIENDLY CAPTURE OF CARBON DIOXIDE AT COAL-FIRED PO$1,253,018
· FY2012 · Department of Energy
DE-FE0031582, 10 MEGAWATTS ELECTRIC (MWE) COAL DIRECT CHEMICAL LOOPING LARGE PILOT PLANT TEST - PHASE I FEASIBILITY$756,769
· FY2018 · Department of Energy
COMPONENT TEST FACILITY (COMTEST) PHASE 1 ENGINEERING FOR 760OC (1400 DEG F) ADVANCED ULTRASUPERCRITICAL (A-USC) STEAM GENERATOR DEVELOPMENT$453,674
· FY2014 · Department of Energy
DE-FC26-06NT42747, MOD 003, NO COST TIME EXTENSION THRU 9/30/2010.$95,591
· FY2009 · Department of Energy
MODULAR, HIGH EFFICIENCY, LOW EMISSIONS PACKAGE BOILER$31,995
· FY2008 · Department of Energy