$28,088,496
Total funding
6
Grants

Funding over time

peak $24.6M · FY200823
$25M$18.8M$12.5M$6.3M$0
'08
'09
'10
'11
'12
'13
'14
'15
'16
'17
'18
'19
'20
'21
'22
'23

Funding mix

By agency

DOE$28,088,496 · 6

By mechanism

$28,088,496 · 6

Investigators at Pacific Gas And Electric Company

InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).

Rising Stars

First grant in the last 5 yrs

Not enough data

Emerging Leaders

6–10 yrs in

Not enough data

All-Time

Most funded here, all years

Not enough data

Largest grants

TAS::89 0328::TAS RECOVERY NEW AWARD TO PACIFIC GAS AND ELECTRIC COMPANY OE SMART GRID DEMONSTRATION$25,000,000
· FY2010 · Department of Energy
A SENSITIVITY-DRIVEN WIDE AREA PROTECTION COORDINATION TOOL FOR HIGH PENETRATION OF IBRS A. PROJECT OBJECTIVES THE PROJECT AIMS TO ACHIEVE THE FOLLOWING GOALS: 1) IMPROVE IBR MODELS USED IN SHORT CIRCUIT PROGRAMS TO ACCURATELY CAPTURE THE RESPONSE OF IBR AT THE BULK POWER SYSTEM (BPS) LEVEL FOR FAULT AND PROTECTION STUDIES. 2) DEVELOP AN AUTOMATION TOOL THAT ALLOWS ENGINEERS TO IDENTIFY PROTECTION COORDINATION AND SENSITIVITY ISSUES BY PERFORMING SHORT-CIRCUIT AND PROTECTION COORDINATION STUDIES IN AN IBR-PENETRATED GRID BY APPLYING VARIATIONS TO THE IBR MODELS, FAULTS, CONTINGENCIES, ETC. 3) DEVELOP NEW PROTECTION MITIGATION SOLUTIONS SCHEME THAT COMPLEMENTS THE EXISTING PROTECTION SYSTEMS TO ENSURE SAFE OPERATION OF THE BPS WITH HIGHER IBR PENETRATION LEVELS, 100% PENETRATION WOULD BE IDEAL, HOWEVER IT REQUIRES THE USED OF GFM INVERTERS, THESE WILL BE INCLUDED IF THE BUDGET AND TIME ALLOW, (REFER TO SECTIONS 2.1 AND 7.0 FOR MORE DETAILS). PROTECTION SYSTEMS WILL INCLUDE DIFFERENT TYPES OF LINE, BUS, AND TRANSFORMER PROTECTION SCHEMES.$1,889,059
· FY2023 · Department of Energy
NEW AWARD. WAVECONNECT WAVE ENERGY IN-WATER TESTING AND DEVELOPMENT PROJECT$1,200,000
· FY2008 · Department of Energy
DEVELOPMENT AND VERIFICATION OF AN IMPROVED MODEL FOR EXTREME GROUND MOTIONS PRODUCED BY EARTHQUAKE$395,427
· FY2009 · Department of Energy
SYNCHROPHASER APPLICATIONS AND FUNCTIONS DEMONSTRATION AND DEPLOYMENT$0
· FY2014 · Department of Energy
WAVECONNECT WAVE ENERGY IN-WATER TESTING AND DEVELOPMENT PROJECT$-395,990