GGrantIndex
← Leaderboards

Rocky Mountain Institute

Boulder, CO

Compare ↔
$17,960,123
Total funding
8
Grants

Funding over time

peak $11.1M · FY201725
$20M$15M$10M$5M$0
'17
'18
'19
'20
'21
'22
'23
'24
'25

Funding mix

By agency

DOE$17,467,738 · 7
NSF$492,385 · 1

By mechanism

$17,960,123 · 8

Investigators at Rocky Mountain Institute

InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).

Rising Stars

First grant in the last 5 yrs

Not enough data

Emerging Leaders

6–10 yrs in

Not enough data

All-Time

Most funded here, all years

Not enough data

Largest grants

ADVANCED BUILDING CONSTRUCTION COLLABORATIVE$5,500,000
· FY2021 · Department of Energy
INTEGRATED MECHANICAL POD: HVAC, DHW, PV INVERTER, STORAGE AND MONITORING INSTRUMENTATION WITH ADVANCED CONTROLS (INTEGRATED MECHANICAL SYSTEM PODS)$5,282,000
· FY2021 · Department of Energy
BIPARTISAN INFRASTRUCTURE LAW (BIL): ANKERON CARBON MANAGEMENT HUB THE PRIMARY OBJECTIVE OF THIS PROJECT IS TO FORMULATE A REGIONAL DIRECT AIR CAPTURE (DAC) HUB CONCEPT IN THE PACIFIC NORTHWEST (PNW) BY CONDUCTING THE RELEVANT ANALYSIS, ENGINEERING, AND STAKEHOLDER ENGAGEMENT NECESSARY TO ADVANCE THE PROJECT FROM A CONCEPT STAGE TO THE BUILT STAGE AND SUPPORT THE WIDER PROGRAM GOAL OF CATALYZING A COMMERCIAL DAC INDUSTRY IN THE UNITED STATES.$2,984,939
· FY2025 · Department of Energy
BIPARTISAN INFRASTRUCTURE LAW (BIL): ELECTRIC VEHICLE CARSHARE VIABILITY: ASSESSING BUSINESS MODELS IN US CITIES FOR RESILIENCY, EQUITY AND EV CHARGING INTEGRATION THIS PROJECT WILL INCLUDE IDENTIFICATION OF PROGRAM COSTS, FUNDERS/SPONSORS, FINANCIAL SAVINGS, AND ENVIRONMENTAL, SOCIAL, AND HEALTH BENEFITS THAT CAN BE ACHIEVED THROUGH THE OPERATION OF A SUCCESSFUL CARSHARE PROGRAM.$1,520,750
· FY2025 · Department of Energy
SAN FRANCISCO AND BAY AREA REGIONAL MEDIUM- AND HEAVY-DUTY ELECTRIFICATION ROADMAP THE OBJECTIVE OF THIS PROJECT IS TO CREATE A ROADMAP FOR TRUCK CHARGING IN THE BAY AREA BY EXAMINING REAL WORLD TRUCK ACTIVITY AND SIMULATING ELECTRIC TRUCK ACTIVITY INTO THE FUTURE TO PROJECT REQUIRED CHARGING INFRASTRUCTURE, CALCULATE LOADS PRODUCED BY THAT CHARGING INFRASTRUCTURE, AND ESTIMATE REQUIRED UPGRADES TO UPSTREAM UTILITY INFRASTRUCTURE.$1,233,642
· FY2023 · Department of Energy
EXPERIMENTAL INTEGRATED ZERO ENERGY READY RETROFIT SOLUTION FOR MULTIFAMILY RENOVATIONS$606,508
· FY2017 · Department of Energy
Pivots: Energy Leadership Accelerator$492,385
· FY2023 · TIP
DE-EE0009663 (BASE AWARD) - ROCKY MOUNTAIN INSTITUTE: ESTIMATING CHARGING INFRASTRUCTURE NEEDS IN STATES COMMITTED TO MEDIUM- AND HEAVY-DUTY TRUCK ELECTRIFICATION$339,899
· FY2021 · Department of Energy