← LeaderboardsInvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Avium, Llc
Lawrence, KS
$6,140,728
Total funding
3
Grants
Funding over time
peak $5M · FY2020–25$5M$3.8M$2.5M$1.3M$0
'20
'21
'22
'23
'24
'25
Funding mix
By agency
DOE$5,190,729 · 2
NSF$949,999 · 1
By mechanism
—$6,140,728 · 3
Investigators at Avium, Llc
InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).
Rising Stars
First grant in the last 5 yrs
Not enough data
Emerging Leaders
6–10 yrs in
Not enough data
All-Time
Most funded here, all years
Not enough data
Largest grants
THE MAIN OBJECTIVE OF THIS PROJECT IS TO FURTHER DEVELOP AVIUM'S CATALYST TECHNOLOGY TO ACHIEVE 2 A CM-2 AT =1.7 V ON A 100 CM2 LIQUID ALKALINE (LA) ELECTROLYZER. TO ACHIEVE THIS OBJECTIVE WE WILL PERFORM THREE PARALLEL TASKS: (1) OPTIMIZE CATALYST GROWTH ONTO ELECTRODES AND LA SEPARATOR FOR MANUFACTURING HIGH CURRENT DENSITY SEAS, (2) 3D-MODEL- DRIVEN DESIGN OF CATALYST-COATED MESH ELECTRODE AND ELASTIC FLOW ELEMENT GEOMETRY TO BALANCE CATALYST ACTIVE AREA WITH MAINTAINING HIGH MASS TRANSFER AND 3D UTILIZATION, AND (3) DEVELOP AN IN SITU CATALYST REGENERATION PROTOCOL TO MAINTAIN AN EFFECTIVE DEGRADATION RATE OF =2.1 MV/KHR TO ENABLE A 100,000 H LIFETIME AT 2 A CM-2. THE OBJECTIVE FOR BUDGET PERIOD 1 IS TO DEVELOP A 15 CM2 SINGLE-CELL FLOW-THROUGH ELECTROLYZER THAT CAN ACHIEVE 1.95 V AT 2 A CM-2. THE OBJECTIVE FOR BUDGET PERIOD 2 IS TO DEVELOP A 100 CM2 SINGLE-CELL FLOW-THROUGH ELECTROLYZER THAT CAN ACHIEVE 1.85 V AT 2 A CM-2 AND DEMONSTRATE THE CAPABILITY TO RE-DEPOSIT CATALYSTS AND RECOVER PERFORMANCE AFTER A 50 MV DECREASE IN CELL VOLTAGE. THE OBJECTIVE FOR BUDGET PERIOD 3 IS A 100 CM2 SINGLE-CELL ELECTROLYZER THAT CAN ACHIEVE 2 A CM-2 AT =1.70 V WITH THE CAPABILITY TO REGENERATE AFTER 50 MV LOSS OF PERFORMANCE FROM ACCELERATED START/STOP CYCLES AND MEET AN EFFECTIVE DEGRADATION RATE OF =2.1 MV KHR-1 TO ENABLE >100,000 H LIFE TIME. THIS IS ALSO THE OVERALL OBJECTIVE FOR THIS PROJECT.$4,985,214
· FY2025 · Department of Energy
SBIR Phase II: Dual Element Matrix (DEM) Water Electrolyzer$949,999
· FY2020 · TIP
IN SITU CATALYST DEPOSITION FOR LIQUID ALKALINE IMPURE WATER ELECTROLYSIS$205,515
· FY2023 · Department of Energy