GGrantIndex
← Leaderboards

Electric Power Research Institute Inc

Compare ↔
$249,507,265
Total funding
128
Grants

Funding over time

peak $51.5M · FY200825
$100M$75M$50M$25M$0
'08
'09
'10
'11
'12
'13
'14
'15
'16
'17
'18
'19
'20
'21
'22
'23
'24
'25

Funding mix

By agency

DOE$248,746,153 · 125
NASA$386,679 · 2
DOD$374,433 · 1

By mechanism

$249,507,265 · 128

Investigators at Electric Power Research Institute Inc

InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).

Rising Stars

First grant in the last 5 yrs

Not enough data

Emerging Leaders

6–10 yrs in

Not enough data

All-Time

Most funded here, all years

Not enough data

Largest grants

ASSESSMENT OF OPPORTUNITIES FOR OPTIMAL RESERVOIR PRESSURE CONTROL, PLUME MANAGEMENT AND PRODUCED WATER STRATEGIES$13,230,749
· FY2017 · Department of Energy
THE OBJECTIVE OF THIS PROJECT IS TO ADVANCE THE DEVELOPMENT OF A DIRECT AIR CAPTURE (DAC) HUB IN THE SOUTHERN SAN JOAQUIN VALLEY OF CALIFORNIA BY DESIGNING, ENGINEERING, AND PLANNING AN INTEGRATED DAC SYSTEM.$11,829,634
· FY2025 · Department of Energy
AWARD NUMBER DE-FE0031993 TO ELECTRIC POWER RESEARCH INSTITUTE FOR PROJECT TITLED GASIFICATION OF COAL AND BIOMASS: THE ROUTE TO NET-NEGATIVE-CARBON POWER AND HYDROGEN$9,393,880
· FY2021 · Department of Energy
BIPARTISAN INFRASTRUCTURE LAW (BIL) - CALIFORNIA-NEVADA CO2 STORAGE PROJECT (CANSTORE) THE OBJECTIVES OF THE CANSTORE PROJECT ARE TO ADDRESS RESEARCH GAPS CRUCIAL TO DE-RISKING AND DEMONSTRATING SUBSURFACE COMMERCIAL-SCALE CO2 STORAGE IN BASALTIC RESERVOIRS, TRANSPORTING CO2 SAFELY AND COST EFFECTIVELY FROM REGIONAL CO2 EMITTERS TO THE STORAGE COMPLEX, PROVIDING CRITICAL INFORMATION TO KEY STAKEHOLDERS AND DEVELOPERS SEEKING CO2 STORAGE OPPORTUNITIES, AND PARTNERING WITH LOCAL STAKEHOLDERS TO PROVIDE TANGIBLE BENEFITS TO THE COMMUNITY AND REGION.$8,999,977
· FY2025 · Department of Energy
TAS::89 0318::TAS ELECTRIC SECTOR CYBER SECURITY - NEW AWARD TO ELECTRIC POWER RESEARCH INSTITUTE, INC. (EPRI)$8,199,722
· FY2010 · Department of Energy
NEW AWARD DE-FE0031842 WITH ELECTRIC POWER RESEARCH INSTITUTE, INC. TITLED CONCRETE THERMAL ENERGY STORAGE ENABLING FLEXIBLE OPERATION WITHOUT COAL PLANT CYCLING$6,859,229
· FY2019 · Department of Energy
GRID-READY ENERGY ANALYTICS TRAINING “GREAT” WITH DATA$6,532,977
· FY2019 · Department of Energy
SMART GRID FUNCTIONALITY; SMART-GRID READY PV INVERTER WITH UTILITY COMMUNICATION$6,436,665
· FY2012 · Department of Energy
THIS PROJECT AIMS TO REDUCE BARRIERS TO SOLAR PHOTOVOLTAIC (PV) CIRCULARITY ACROSS THE VALUE CHAIN THROUGH INNOVATIVE TECHNOLOGY SOLUTIONS, STRATEGIC PARTNERSHIPS, AND COMMUNITY BENEFITS.$5,979,459
· FY2025 · Department of Energy
DE-FE0032223 ELECTRIC POWER RESEARCH INSTITUTE CO2 CAPTURE AT LOUISVILLE GAS & ELECTRIC CANE RUN NATURAL GAS COMBINED CYCLE POWER PLANT$5,842,517
· FY2023 · Department of Energy
NEW AWARD FOR SMALL MODULAR REACTOR PRESSURE VESSEL MANUFACTURING & FABRICATION TECHNOLOGY DEVELOPMENT$5,720,149
· FY2017 · Department of Energy
GRIDFAST EXPRESS: ROADMAP AND ACTIONS TO ADDRESS KEY CHALLENGES TO THE UTILITY INTERCONNECTION PROCESS THE OBJECTIVE OF THE PROJECT IS TO ESTABLISH A COMPREHENSIVE NATIONAL PROGRAM FOCUSED ON STREAMLINING THE UTILITY INTERCONNECTION PROCESS RELATED TO ELECTRIC VEHICLES (EVS) FOR BOTH AC LEVEL 2 AND DC FAST CHARGING TECHNOLOGIES AND WITH RESPECT TO OPPORTUNITIES IN THE FOLLOWING AREAS: PROCESSING UTILITY SERVICE REQUESTS FOR CHARGING INFRASTRUCTURE, RESOURCES FOR FRONT-LINE UTILITY STAFF, RESOURCES FOR PROSPECTIVE SITE HOSTS, EQUITY & ENERGY JUSTICE, AND WORKFORCE & TRAINING. OVERALL GOALS ARE TO ADVANCE APPROACHES AT SCALE TO REDUCE SOFT COSTS, SUPPORT ACCELERATED DEMAND FOR NEW EV CHARGING INFRASTRUCTURE, AND PROMOTE INCREASED PARTICIPATION IN THE CLEAN ENERGY JOBS OF THE FUTURE.$5,493,941
· FY2025 · Department of Energy
COMPETITIVE COOPERATIVE AGREEMENT: U.S. INDUSTRY OPPORTUNITIES FOR ADVANCED NUCLEAR TECHNOLOGY DEVELOPMENT FOA #DE-FOA-0001817 PATHWAY 2 - ADVANCED REACTOR DEVELOPMENT PROJECTS$5,128,696
· FY2021 · Department of Energy
DESIRED – DEEP EFFICIENCY AND SMART GRID INTEGRATED RETROFITS IN DISADVANTAGED COMMUNITIES$4,900,000
· FY2022 · Department of Energy
SOLAR CRITICAL INFRASTRUCTURE ENERGIZATION SYSTEM (SOLACE)$4,771,301
· FY2021 · Department of Energy
NEW AWARD TO: ELECTRIC POWER RESEARCH INSTITUTE, INC. AWARD NUMBER: DE-FE0031945 PROJECT TITLED: ENGINEERING-SCALE TEST OF A WATER-LEAN SOLVENT FOR POST-COMBUSTION$4,228,677
· FY2021 · Department of Energy
LEVERAGING INDUSTRY RESEARCH TO EDUCATE A FUTURE ELECTRIC GRID WORKFORCE$4,200,001
· FY2013 · Department of Energy
DE-FE0031761 - ELECTRIC POWER RESEARCH INSTITUTE INCORPORATED - PROJECT TITLED, ''CONCRETE THERMAL ENERGY STORAGE ENABLING FLEXIBLE OPERATION WITHOUT COAL PLANT CYCLING'' - NEW AWARD$3,910,720
· FY2019 · Department of Energy
SOLAR ENERGY COMMUNITY RESILIENCY (SECURE)$3,461,721
· FY2021 · Department of Energy
THE PRIMARY OBJECTIVE OF THIS PROPOSED DEMONSTRATION PROJECT IS TO ESTABLISH AND COMPLETE THE COLLABORATIVE ANCILLARY SERVICE ACCELERATOR FOR RENEWABLES (CASAR) PILOT PROGRAM TO SUPPORT THE ELECTRIC INDUSTRY TO REALIZE SIGNIFICANT RENEWABLE TARGETS AND A NET-ZERO CARBON ELECTRICITY SECTOR. THROUGH THE CASAR PILOT PROGRAM, THE PROJECT TEAM WILL ENGAGE A DIVERSE SET OF STAKEHOLDERS TO DEVELOP AND EXECUTE A COLLABORATIVE PILOT PROGRAM TO UNDERSTAND THE FEASIBILITY, VIABILITY, PERFORMANCE, AND ECONOMICS OF PROVIDING ANCILLARY SERVICES FOR THE BULK POWER SYSTEM WITH RENEWABLE ENERGY RESOURCES. THE PROJECT TEAM WILL ENGAGE WITH INDUSTRY STAKEHOLDERS IN THE DESIGN, IMPLEMENTATION, AND DEMONSTRATION OF MULTI-LEVEL CONTROL ARCHITECTURES TO SUPPORT ANCILLARY SERVICES FROM WIND AND SOLAR INVERTER BASED RESOURCES (IBRS). THIS RESEARCH WILL DEMONSTRATE THE CAPABILITY OF THESE TECHNOLOGIES TO PROVIDE A COLLECTION OF BULK SYSTEM ANCILLARY SERVICES RELIABLY, INSTILLING THE CONFIDENCE NEEDED FROM SYSTEM OPERATORS, WHILE ALSO DOING SO COST EFFECTIVELY INCLUDING DURING TIMES WHERE THE SERVICE QUANTITY WOULD OTHERWISE BE DEFICIENT. EPRI WILL WORK TOGETHER WITH THE PROJECT TEAM AND INDUSTRY STAKEHOLDERS TO DESIGN A PILOT PROGRAM THAT WILL ENABLE MULTIPLE DEMONSTRATION SITES OVER A 6-12 MONTH PERIOD THAT WILL PERMIT ALL ENTITIES TO WITNESS THE BENEFITS OF PROVISIONING OF THESE SERVICES BY WIND AND SOLAR AND DETERMINE MODIFICATIONS TO ENABLE THE EVENTUAL FULL PARTICIPATION WITH FORMAL AGREEMENTS BETWEEN PROVIDERS AND OPERATORS AND TARIFF MODIFICATIONS THAT ALLOW FOR PARTICIPATION OF THESE RESOURCES WITHIN ANCILLARY SERVICE MARKETS.$3,413,818
· FY2025 · Department of Energy