← LeaderboardsInvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Free Form Fibers L.L.C.
Saratoga Springs, NY
$7,983,871
Total funding
10
Grants
Funding over time
peak $2.1M · FY2011–23$2.5M$1.9M$1.3M$625K$0
'11
'12
'13
'14
'15
'16
'17
'18
'19
'20
'21
'22
'23
Funding mix
By agency
DOE$6,553,871 · 7
NSF$1,430,000 · 3
By mechanism
—$7,983,871 · 10
Investigators at Free Form Fibers L.L.C.
InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).
Rising Stars
First grant in the last 5 yrs
Not enough data
Emerging Leaders
6–10 yrs in
Not enough data
All-Time
Most funded here, all years
Not enough data
Largest grants
AN ADDITIVE MANUFACTURING TECHNOLOGY FOR THE FABRICATION AND CHARACTERIZATION OF NUCLEAR REACTOR FUEL$2,147,371
· FY2014 · Department of Energy
ULTRA-THIN 3-D CERAMIC MATRIX COMPOSITE CLADDING$1,300,000
· FY2019 · Department of Energy
HYBRID SIC-SIC CMCS$1,300,000
· FY2023 · Department of Energy
ADVANCED FUEL FABRICATION FROM THE GAS PHASE$1,150,000
· FY2018 · Department of Energy
SBIR Phase II: The Digital Spinneret$1,070,000
· FY2012 · TIP
DESIGN, MODELING, AND EXPERIMENTAL VALIDATION FOR LIFE-OPTIMIZATION OF HYDROGEN TURBINE CMC COMPONENTS$250,000
· FY2022 · Department of Energy
HOMOGENEOUS JOINING OF SILICON CARBIDE FIBER REINFORCED SILICON CARBIDE MATRIX COMPOSITES$206,500
· FY2021 · Department of Energy
FIBER-EMBEDDED WIRELESS SENSORS$200,000
· FY2023 · Department of Energy
SBIR Phase I: The Digital Spinneret$180,000
· FY2011 · TIP
SBIR Phase I: Designing an Immune System Response Into High-Temperature Ceramic Matrix Composite Materials (CMC)$180,000
· FY2013 · TIP