GGrantIndex
← Leaderboards

Ohio Aerospace Institute

Compare ↔
$23,069,535
Total funding
32
Grants

Funding over time

peak $6.6M · FY200821
$10M$7.5M$5M$2.5M$0
'08
'09
'10
'11
'12
'13
'14
'15
'16
'17
'18
'19
'20
'21

Funding mix

By agency

NASA$19,393,659 · 30
DOD$3,675,875 · 2

By mechanism

$23,069,535 · 32

Investigators at Ohio Aerospace Institute

InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).

Rising Stars

First grant in the last 5 yrs

Not enough data

Emerging Leaders

6–10 yrs in

Not enough data

All-Time

Most funded here, all years

Not enough data

Largest grants

THE OHIO SPACE GRANT CONSORTIUM (OSGK!:), ESTABLISHED LN 1989, IS COMPOSED OF 27 DIVERSE AFFILIATES OFFERING STEM DEGREE PROGRAMS LOCATED THROUGHOUT$3,615,000
· FY2015 · National Aeronautics and Space Administration
THE OBJECTIVES OF THE NATIONAL SPACE GRANT COLLEGE AND FELLOWSHIP PROGRAM ARE 1. TO ESTABLISH A NATIONAL NETWORK OF UNIVERSITIES WITH INTERESTS AND C$3,360,000
· FY2010 · National Aeronautics and Space Administration
THE STATEMENT OF WORK ENTITLED, "AIR FORCE RESEARCH LABORATORY INITIATIVE", DATED 16 MAY 2004, IS ATTACHMENT 1 TO THE AGREEMENT.$3,353,790
· FY2008 · Department of the Air Force
2009 LEWIS' EDUCATIONAL AND RESEARCH COLLABORATIVE INTERNSHIP PROGRAM$3,004,434
· FY2009 · National Aeronautics and Space Administration
THE OHIO AEROSPACE INSTITUTE (OAI) INTENDS TO PROPOSE TO SERVE AS THE BUSINESS MANAGEMENT ORGANIZATION FOR THE NASA ONE STOP SHOPPING INITIATIVE (OSS$2,617,553
· FY2010 · National Aeronautics and Space Administration
NASA AERONAUTICAL MISSIONS NEED HIGH-TEMPERATURE ELECTRONICS AND SENSORS FOR REAL TIME HEALTH MONITORING OF AERONAUTIC ENGINES TO IMPROVE AVIATION SA$1,119,993
· FY2008 · National Aeronautics and Space Administration
UPDATING THE COMMUNICATION INFRASTRUCTURE AND THE COMMERCIALIZATION OF SPACE TRAVEL WILL REQUIRE ENABLING TECHNOLOGIES TO BE DEVELOPED ALLOWING US TO$870,440
· FY2014 · National Aeronautics and Space Administration
SAP PURCHASE REQUISITION: 4200293672$868,457
· FY2009 · National Aeronautics and Space Administration
TIME-RESOLVED LASER RAMAN SPECTROSCOPY FOR SCALAR MEASUREMENTS OF SWIRL-STABILIZED LIQUID-FUELED COM$614,577
· FY2008 · National Aeronautics and Space Administration
TECHNOLOGY ADVANCEMENTS ARE TRANSFORMING COMMUNICATION SYSTEMS AND NETWORKS WITH THE ADOPTION OF SOFTWARE RADIOS BECOMING MORE PREVALENT ACROSS COMMU$583,492
· FY2014 · National Aeronautics and Space Administration
PROJECT PROPOSES TO EVALUATE A U-233/TH-232 FUELED ADVANCED HIGH TEMPERATURE REACTOR (AHTR) OR MODI$336,000
· FY2010 · National Aeronautics and Space Administration
AFRL SENIOR CAPSTONE$322,085
· FY2009 · Defense Contract Management Agency
THE LEAVES (LOFTED ENVIRONMENTAL AND ATMOSPHERIC VENUS SENSORS) ARCHITECTURE IS A SWARM APPROACH TO OBTAINING KEY IN SITU VENUS ATMOSPHERIC DATA FOR EXCEPTIONALLY LOW COST AND RISK. THIS IS MADE POSSIBLE BY AN ULTRA-LIGHTWEIGHT PASSIVELY LOFTED$232,570
· FY2021 · National Aeronautics and Space Administration
RECENT ADVANCES IN WIDE-BANDGAP ELECTRONICS HAS RESULTED IN DEVELOPMENT OF ELECTRONIC CIRCUITS CAPABLE OF OPERATION IN THE HIGH TEMPERATURE CORROSIVE ENVIRONMENT OF THE VENUS SURFACE LEADING TO POSSIBILITY OF A FUTURE MISSION OPERATING AT THE AMBIENT TEMPERATURE OF VENUS. HOWEVER THE SCIENTIFIC INSTRUMENTATION THAT WOULD FLY ON SUCH A MISSION STILL NEEDS FURTHER DEVELOPMENT. IN PARTICULAR IT IS HIGHLY DESIRABLE THAT ANY MISSION TO THE SURFACE OF VENUS WOULD INCLUDE A CAMERA BUT DESIGNS FOR CAMERAS THAT OPERATE AT TEMPERATURES OF 450 C DO NOT CURRENTLY EXIST. WE PROPOSE TO DEVELOP AN INTEGRATED IMAGING ARRAY CAPABLE OF OPERATING FOR LONG PERIODS OF TIME (MONTHS) IN THE AMBIENT VENUS SURFACE ENVIRONMENT (740K 92 BARS). ALL CONVENTIONAL APPROACHES TO OPERATING A CAMERA ON THE SURFACE OF VENUS HAVE REQUIRED A SEALED VESSEL TO THERMALLY ISOLATE A CAMERA FROM THE ENVIRONMENT MOST SPECIFICALLY FROM THE EXTERNAL TEMPERATURE. THIS REQUIRES A PROTECTED INSULATED AND WINDOWED VESSEL AND THE HEAT LEAK FROM THE VENUS THERMAL ENVIRONMENT NECESSARILY RESULTS IN AN OPERATIONAL LIFETIME OF AT MOST A FEW HOURS BEFORE THE SYSTEM UNDERGOES THERMAL FAILURE. SUCH SYSTEMS ALSO INCUR THE SIGNIFICANT PENALTIES OF INCREASED SPACECRAFT MASS (AND POWER IF ACTIVE COOLING IS USED.) IN CONTRAST OUR PROPOSED APPROACH IS INTENDED TO PROVIDE AN IMAGER WITH AN EXTENDED OPERATING LIFETIME AT VENUS AMBIENT TEMPERATURE CONSISTENT WITH OTHER LONG-LIVED LANDER TECHNOLOGIES CURRENTLY UNDER ACTIVE DEVELOPMENT. THE COMBINATION OF HIGH-TEMPERATURE INTEGRATED CIRCUITS (CONSISTING OF AMPLIFIERS LOGIC GATES AND ANALOG-TO-DIGITAL CONVERTERS) WITH SMALL WAVELENGTH-APPROPRIATE PHOTOVOLTAIC DIODES ALLOWS FOR THE CONSTRUCTION OF A LOW-MASS LOW-POWER IMAGING PHOTODETECTOR ARRAY THAT IS ABLE TO FUNCTION CONTINUOUSLY FOR TIMESCALES COMPARABLE TO A VENUS SOLAR DAY (117 EARTH DAYS). FOLLOWING THE EXAMPLE OF THE VIKING MARS LANDER CAMERAS THIS EFFORT WILL START WITH THE DEMONSTRATION OF A LOW-BANDWIDTH LINEAR ARRAY SCANNING PLATFORM CAPABLE OF GRADUALLY BUILDING UP A HIGH RESOLUTION VISIBLE LIGHT PANORAMA OF A LANDING SITE THROUGH A SIMPLE ACTUATION MECHANISM. WE WILL LEVERAGE SIGNIFICANT HIGH-TEMPERATURE HARSH ENVIRONMENT EXPERTISE IN DESIGNING AND MANUFACTURING ELECTRONIC CIRCUITS OPTICAL DETECTORS AND COMPONENTS AND ACTUATORS TO ENABLE A MISSION-ENABLING ADVANCE IN IMAGING FOR VENUS EXPLORATION AND SCIENCE. THERE IS DRIVING SCIENCE NEED FOR SUCH A CAPABILITY. OF TWENTY-FIVE MISSIONS TO LAND ON VENUS ONLY FOUR HAVE RESULTED IN IMAGES FROM THE SURFACE WHERE THE MOST RECENT IMAGES WERE COLLECTED IN 1982. VISUAL IMAGERY AT A MICROSCOPIC AND MACROSCOPIC SCALE HAVE BEEN TRANSFORMATIONAL FOR MARS SCIENCE WHICH DEMONSTRATES THAT CONTEXTUAL IMAGES OF ROCK AND REGOLITH TEXTURE AT THE MILLIMETER SCALE AND LANDING SITE GEOLOGY/GEOMORPHOLOGY AT THE KILOMETER SCALE ARE CRITICAL TOOLS FOR INTERROGATING AND UNDERSTANDING THE HISTORY AND CURRENT STATE OF A PLANETARY SURFACE. THE HIGH TEMPERATURE PRESSURE AND REACTIVITY OF VENUS NEAR-SURFACE ATMOSPHERE MAKE IT UNFEASIBLE TO REPURPOSE AND ADAPT INSTRUMENTS WITH SIGNIFICANT FLIGHT HERITAGE FOR USE OUTSIDE A THERMALLY AND CHEMICALLY PROTECTED SHELL SO THIS DEVELOPMENT EFFORT UNDER THE PICASSO PROGRAM IS BOTH APPROPRIATE AND NEEDED. THE IMAGING SYSTEM PRODUCED BY THIS EFFORT WOULD BE SUITABLE FOR DEPLOYMENT ON FUTURE VENUS LANDERS AND ROVERS WITH A LIFETIME LONG ENOUGH TO OBSERVE TRANSIENT SURFACE PHENOMENA AND OVER TIME OBTAIN A SUITE OF MICROSCOPIC CONTEXT IMAGES THAT WOULD FACILITATE SMALL SAMPLE ANALYSIS OF ROCK GRAINS AND MINERALS. DEMONSTRATION OF SUCH A PROOF OF- CONCEPT SYSTEM WITH PHOTODETECTORS ELECTRONICS AND BASIC ACTUATION MECHANISMS WILL PROVIDE THE BASIS FOR A REVOLUTIONARY NEW AVENUE OF VENUS EXPLORATION.$226,080
· FY2020 · National Aeronautics and Space Administration
WE PROPOSE TO UNDERTAKE AN UPDATED FAULT ANALYSIS OF THE 20% OF VENUS SURFACE DESCRIBED BY A RECENT TOPOGRAPHIC MODEL DERIVED FROM STEREO-MATCHING IMAGING TECHNIQUES.$216,010
· FY2020 · National Aeronautics and Space Administration
THE OHIO AEROSPACE INSTITUTE REQUESTS FUNDS TO IMPLEMENT THE STUDENTS AND TEACHERS EXPLORING LOCAL L$211,225
· FY2008 · National Aeronautics and Space Administration
ADDITIVE MANUFACTURING ALLOWS CUSTOM DESIGNED AND HIGH VALUE PARTS LAYER BY LAYER- ENABLING COMPLEX SHAPES FROM A WIDE RANGE OF MATERIALS WITHOUT THE$200,000
· FY2014 · National Aeronautics and Space Administration
DEVELOPMENT OF EFFICIENT HIGH ORDER COMPACT DIFFERENCING METHODS FOR SOLVING A SYSTEM OF FLUID EQUAT$160,659
· FY2008 · National Aeronautics and Space Administration
THIS PROJECT IS MEANT TO PROVIDE NASA WITH A WHITE PAPER THAT LISTS AND EVALUATES DIFFERENT FORMS OF ADVANCED PROPULSION THAT COULD POTENTIALLY PROVIDE A WAY OF SENDING A PROBE TO ANOTHER STAR IN THE FUTURE.$152,020
· FY2020 · National Aeronautics and Space Administration
THE OHIO AEROSPACE INSTITUTE (OAI) PROPOSES THAT THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) CONTINUE AS A KEY MEMBER OF THE AEROACOUSTICS RESEARCH CONSORTIUM (AARC) DURING THE FISCAL YEARS 2020 AND 2021.$149,918
· FY2020 · National Aeronautics and Space Administration