GGrantIndex
← Leaderboards

Hr Wallingford Limited

Compare ↔
$3,545,068
Total funding
17
Grants

Funding over time

peak $1.1M · FY200824
$2M$1.5M$1M$500K$0
'08
'09
'10
'11
'12
'13
'14
'15
'16
'17
'18
'19
'20
'21
'22
'23
'24

Funding mix

By agency

DOD$3,545,068 · 17

By mechanism

$3,545,068 · 17

Investigators at Hr Wallingford Limited

InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).

Rising Stars

First grant in the last 5 yrs

Not enough data

Emerging Leaders

6–10 yrs in

Not enough data

All-Time

Most funded here, all years

Not enough data

Largest grants

COASTAL AND FLUVIAL HAZARD ANALYSIS, NUMERICAL MODELING OF FLUID, SEDIMENTS AND IMMERSED/FLOATING SOLIDS$1,128,563
· FY2015 · Department of the Army
NUMERICAL MODELLING OF FLUID SEDIMENTS AND IMMERSED & FLOATING SOLIDS AND VESSEL NAVIGATION SIMULATION$1,037,381
· FY2024 · Department of the Army
RESEARCH TO EVALUATE WAYS OF IMPROVING COMMUNITY LEVEL RESILIENCE AND EVACUATION PLANNING ON THE US EAST COAST TO INCREASED COASTAL STORMINESS$289,885
· FY2014 · Department of Defense
FLOOD RISK MANAGEMENT: A DEMONSTRATION AND EXCHANGE OF SUPPORTING SCIENCE, TOOLS AND TECHNIQUES$259,337
· FY2010 · Department of the Army
RESEARCH TO EVALUATE THE IMPACT OF POTENTIAL CHANGES IN MEAN AND EXTREME SEA LEVELS ON THE VULNERABILITY OF NORTH ATLANTIC COAST, ALLOWING FOR VARIOU$249,976
· FY2013 · Department of Defense
NUMERICAL MODELLING OF FLUID, SEDIMENTS & IMMERSED/FLOATING SOLIDS, FLOATING & POWERED NAVIGABLE VESSEL BEHAVIOR & INTERACTIONS$170,000
· FY2022 · Department of the Army
APPLIED RESEARCH ON PROCEDURES TO EVALUATE AND ADAPT TO CHANGES IN MEAN AND EXTREME SEA LEVELS$141,340
· FY2013 · Department of Defense
TESTING AND VALIDATION OF PROTEUS CFD MODEL THROUGH ASSESSMENT OF ITS PERFORMANCE WITH REFERENCE TO SELECTED TEST CASES$108,750
· FY2014 · Department of Defense
DEVELOPMENT AND APPLICATION OF REGIONAL SYSTEM RISK ASSESSMENT MODELS TO SUPPORT LONG TERM FLOOD RISK MANAG$58,650
· FY2010 · Department of the Army
DEVELOPMENT AND APPLICATION OF REGIONAL SYSTEM RISK ASSESSMENT MODELS TO SUPPORT LONG TERM FLOOD RISK MANAGEMENT$49,640
· FY2008 · Department of the Army
COMPARISON OF LEVEE BREACH RATES USING PHYSICS-BASED MODELS$26,919
· FY2014 · Department of Defense
PROCEDURES TO EVALUATE SEA LEVEL CHANGE IMPACTS, RESPONSES AND ADAPTATION$6,600
· FY2010 · Department of the Army
VISIT TO ERDC VICKSBURG, MS$4,395
· FY2014 · Department of Defense
SUPPORT TO ATTEND THE SURFACE EROSION AND BREACH WORKSHOP AT THE HYDRAULIC ENGINEERING$4,057
· FY2015 · Department of Defense
VISIT TO ERDC VICKSBURG, 3-7 MARCH 2014$3,595
· FY2014 · Department of Defense
SUPPORT TO ATTEND THE ERDC WORKSHOP ON LEVEE VEGETATION 14-18 JUNE 2009 IN VICKSBURG, MS$3,025
· FY2009 · Department of the Army
SUPPORT TO ATTEND THE ERDC WORKSHOP ON LEVEE VEGETATION$2,955
· FY2009 · Department of the Army