Cummins Electrified Power Na Inc.
$24,408,607
Total funding
4
Grants
Funding over time
peak $16.3M · FY2021–25$20M$15M$10M$5M$0
'21
'22
'23
'24
'25
Funding mix
By agency
DOE$23,124,756 · 3
DOD$1,283,851 · 1
By mechanism
—$24,408,607 · 4
Investigators at Cummins Electrified Power Na Inc.
InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).
Rising Stars
First grant in the last 5 yrs
Not enough data
Emerging Leaders
6–10 yrs in
Not enough data
All-Time
Most funded here, all years
Not enough data
Largest grants
BIL - MULTILAYER MEMBRANE-ELECTRODE-SUBGASKET-PTL ASSEMBLY (MESPA) FOR FACILE ASSEMBLY OF PEM ELECTROLYSIS STACKS$16,326,772
· FY2025 · Department of Energy
THE OBJECTIVE OF THE PROJECT IS TO DEVELOP AND DEMONSTRATE A HIGH-VOLUME MANUFACTURING PROCESS FOR SOLID OXIDE ELECTROLYZER CELLS AND STACKS. THE OBJECTIVE OF BUDGET PERIOD 1 IS TO DEVELOP THE SPECIFICATIONS FOR THE HIGH-VOLUME MANUFACTURING PROCESS EQUIPMENT, DOWN-SELECT EQUIPMENT SUPPLIERS CAPABLE OF MEETING OR EXCEEDING THESE SPECIFICATIONS AND PLACING PURCHASE ORDERS FOR THE SELECTED EQUIPMENT. THE OBJECTIVE OF BUDGET PERIOD 2 IS TO BUILD THE MANUFACTURING AUTOMATION LABORATORY, COMMISSION IT, AND DEMONSTRATE ITS ABILITY TO MANUFACTURE A 60 KW SOEC STACK AND MEET THE OVERALL PROJECT METRICS.$5,000,000
· FY2022 · Department of Energy
DE-EE0009214 WITH CUMMINS ELECTRIFIED POWER NORTH AMERICA INCORPORATED TITLED ''INTEGRATED FUEL CELL ELECTRIC POWERTRAIN DEMONSTRATION''. THE PRIMARY OBJECTIVE OF THIS PROJECT IS TO DEVELOP AND DEMONSTRATE A MODULAR AND SCALABLE INTEGRATED FUEL CELL ELECTRIC POWERTRAIN FOR USE IN HEAVY-DUTY TRUCKS AND BUSES.$1,797,984
· FY2021 · Department of Energy
FUEL CELL BATTERY POWERED HYBRID EMERGENCY RELIEF TRUCK$1,283,851
· FY2024 · Department of the Army