← LeaderboardsInvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Beam Power Technology, Inc.
Sudbury, MA
$6,221,618
Total funding
8
Grants
Funding over time
peak $4.9M · FY2008–13$5M$3.8M$2.5M$1.3M$0
'08
'09
'10
'11
'12
'13
Funding mix
By agency
DOE$5,975,000 · 6
NSF$246,618 · 2
By mechanism
—$6,221,618 · 8
Investigators at Beam Power Technology, Inc.
InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).
Rising Stars
First grant in the last 5 yrs
Not enough data
Emerging Leaders
6–10 yrs in
Not enough data
All-Time
Most funded here, all years
Not enough data
Largest grants
DEVELOPMENT OF A PULSED, 10% DUTY 140 KW, 402.5 MHZ ELLIPTIC-BEAM INDUCTIVE OUTPUT TUBE$2,200,000
· FY2009 · Department of Energy
DESIGN STUDIES OF MEGAWATT-CLASS CONTINUOUS-WAVE ELLIPTIC-BEAMI INDUCTIVE OUTPUT TUBES$2,200,000
· FY2009 · Department of Energy
DEVELOPMENT OF A NON-AXISYMMETRIC PERMANENT MAGNET FOCUSING SYSTEM FOR ELLIPTIC CHARGE PARTICLE BEAMS$850,000
· FY2008 · Department of Energy
DEVELOPMENT OF A NON-AXISYMMETRIC PERMANENT MAGNET FOCUSING SYSTEM FOR ELLIPTIC CHARGE PARTICLE BEAM$375,000
· FY2009 · Department of Energy
TAS::89 0222::TAS NEW PHASE I SBIR; TITLE: DESIGN OF A CONVERGING ELLIPTIC GUN FOR ELLIPTIC-BEAM KLYSTRON APPLICATIONS; PI: JING ZHOU$200,000
· FY2010 · Department of Energy
1 MW CW 704 MHZ ELLIPTIC BEAM INDUCTIVE OUTPUT TUBE (EBIOT)$150,000
· FY2013 · Department of Energy
SBIR Phase I: High-efficiency, high-power, lightweight elliptic-beam traveling-wave-tube amplifier for satellite communications$146,618
· FY2010 · TIP
SBIR Phase I: High-efficiency Multi-carrier Ribbon-beam Amplifier for Wireless Communications$100,000
· FY2009 · TIP