← LeaderboardsInvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Calabazas Creek Research, Inc.
San Mateo, CA
$22,314,691
Total funding
38
Grants
Funding over time
peak $4.3M · FY2008–25$5M$3.8M$2.5M$1.3M$0
'08
'09
'10
'11
'12
'13
'14
'15
'16
'17
'18
'19
'20
'21
'22
'23
'24
'25
Funding mix
By agency
DOE$22,215,166 · 37
NSF$99,525 · 1
By mechanism
—$22,314,691 · 38
Investigators at Calabazas Creek Research, Inc.
InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).
Rising Stars
First grant in the last 5 yrs
Not enough data
Emerging Leaders
6–10 yrs in
Not enough data
All-Time
Most funded here, all years
Not enough data
Largest grants
TAS::89 0222::TAS NEW PHASE I SBIR; TITLE: DEVELOPMENT OF A 100 KW, 2.815 GHZ KLYSTRON; PI: PATRICK FERGUSON$1,979,480
· FY2010 · Department of Energy
HIGH EFFICIENCY KLYSTRON, 1.3 GHZ, 200 KW CW$1,349,370
· FY2023 · Department of Energy
HIGH-EFFICIENCY, HIGH AVERAGE POWER INDUCTIVE OUTPUT TUBES$1,325,786
· FY2019 · Department of Energy
SBIR-PHASE I NEW; A HIGH-POWER, BROADBAND WINDOW FOR STEP-TUNABLE GYROTRONS; ROBERT IVES$1,288,342
· FY2012 · Department of Energy
MULTIPLE BEAM POWER GRID TUBES FOR HIGH FREQUENCY AND HIGH POWER OPERATION$1,196,776
· FY2018 · Department of Energy
SBIR-PHASE I NEW; 10 MW, L-BAND KLYSTRON FOR ACCELERATORS; MICHAEL READ$1,185,949
· FY2012 · Department of Energy
DIRECT COUPLED GYROTRONS FOR PLASMA HEATING$1,155,196
· FY2018 · Department of Energy
LOW-COST, HIGH-EFFICIENCY TRIODE MAGNETRONS FOR ACCELERATOR APPLICATIONS$1,147,055
· FY2014 · Department of Energy
HIGH EFFICIENCY KLYSTRONS FOR ACCELERATOR APPLICATIONS$1,145,707
· FY2017 · Department of Energy
ROBUST RF PHOTOCATHODES$1,125,088
· FY2013 · Department of Energy
1300 MHZ PPM FOCUSED KLYSTRON FOR PROJECT X$1,122,529
· FY2012 · Department of Energy
NEW SBIR PHASE I 2009: 2 MW CW WATERLOAD FOR ELECTRON CYCLOTRON HEATING SYSTEMS; PI - ROBERT LAWRENCE IVES$1,099,990
· FY2009 · Department of Energy
ADDITIVE MANUFACTURED RF LOAD FOR ITER$1,028,109
· FY2019 · Department of Energy
TAS::89 0222::TAS NEW PHASE I SBIR; TITLE: HIGH CURRENT DENSITY LONG LIFE CATHODES FOR HIGH POWER RF SOURCES; PI: ROBERT IVES$950,000
· FY2010 · Department of Energy
TAS::89 0222::TAS NEW PHASE I 2010 STTR; TITLE: HIGH POWER RF WINDOWS FOR ACCELERATOR APPLICATIONS; PI: ROBERT IVES$933,898
· FY2010 · Department of Energy
A 200 KW, 350 MHZ INDUCTIVE OUTPUT TUBE FOR RF ACCELERATORS$849,609
· FY2008 · Department of Energy
350 MHZ 200 KW CW MULTIPLE BEAM INDUCTIVE OUTPUT TUBE$423,721
· FY2009 · Department of Energy
NEW SBIR PHASE I 2009: 10 MW L-BAND KLYSTRON FOR ACCELERATORS; PI - MICHAEL READ$200,000
· FY2009 · Department of Energy
TAS::89 0222::TAS NEW PHASE I SBIR; TITLE: DEVELOPMENT OF A 402.5 MHZ 140 KW INDUCTIVE OUTPUT TUBE; PI: ROBERT IVES$200,000
· FY2010 · Department of Energy
NEW SBIR PHASE I 2009: AN ADVANCED SIMULATION CODE FOR MODELING INDUCTIVE OUTPUT TUBES; PI - ROBERT LAWRENCE IVES$200,000
· FY2009 · Department of Energy