GGrantIndex
← Leaderboards

Microbeam Technologies Incorporated

Grand Forks, ND

Compare ↔
$5,070,829
Total funding
11
Grants

Funding over time

peak $1.4M · FY201723
$2M$1.5M$1M$500K$0
'17
'18
'19
'20
'21
'22
'23

Funding mix

By agency

DOE$4,482,648 · 9
NSF$588,181 · 2

By mechanism

$5,070,829 · 11

Investigators at Microbeam Technologies Incorporated

InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).

Rising Stars

First grant in the last 5 yrs

Not enough data

Emerging Leaders

6–10 yrs in

Not enough data

All-Time

Most funded here, all years

Not enough data

Largest grants

AWARD DE-FE0031547 FOR PROJECT ENTITLED, IMPROVING COAL FIRED PLANT PERFORMANCE THROUGH INTEGRATED PREDICTIVE AND CONDITION-BASED MONITORING TOOLS$1,384,560
· FY2018 · Department of Energy
AWARD DE-FE0031750 TO MICROBEAM TECHNOLOGIES INCORPORATED FOR PROJECT TITLED DEMONSTRATION OF MULTI-GAMMA BASED SENSOR TECHNOLOGY FOR AS-FIRED COAL PROPERTY MEASUREMENT$1,226,094
· FY2019 · Department of Energy
AWARD NUMBER: DE-FE0032083 NEW AWARD TO: MICROBEAM TECHNOLOGIES INCORPORATED PROJECT TITLED: DEVELOPMENT OF NOVEL SINTERED CARBON-ORE BUILDING MATERIALS$517,702
· FY2021 · Department of Energy
SBIR Phase II: Feasibility of On-line Metalloid Recovery in Gasification Systems$499,650
· FY2004 · TIP
OPTIMIZATION OF COAL WASTE/BIOMASS GASIFICATION FOR HYDROGEN PRODUCTION$249,974
· FY2022 · Department of Energy
INTEGRATION OF COAL-FIRED POWER PLANTS FIRESIDE OPTIMIZATION TOOLS WITH THE IDAES PLATFORM$249,969
· FY2020 · Department of Energy
DECHLORINATION OF MIXED-PLASTICS FEEDSTOCK WITH LOW TEMPERATURE PYROLYSIS FOR DOWNSTREAM GASIFICATION AND HYDROGEN PRODUCTION$249,952
· FY2023 · Department of Energy
DEVELOPMENT OF SORTING ALGORITHM FOR CRITICAL MINERAL-RICH COAL RESOURCE FEEDSTOCKS FOR USE IN FULL-STREAM ANALYZERS$249,886
· FY2021 · Department of Energy
DE-FE0032124 MICROBEAM TECHNOLOGIES INCORPORATED - PROJECT TITLED : PRODUCTION OF GERMANIUM AND GALLIUM CONCENTRATES FOR INDUSTRIAL PROCESSES$199,921
· FY2022 · Department of Energy
SPOUTED FLUID BEDS FOR MERCURY REMOVAL FROM COAL$154,590
· FY2017 · Department of Energy
SBIR Phase I: Feasibility of On-line Metalloid Recovery in Gasification Systems$88,531
· FY2003 · TIP