← LeaderboardsInvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Alameda Applied Sciences Corporation
Oakland, CA
$9,471,315
Total funding
19
Grants
Funding over time
peak $1.7M · FY2008–17$2M$1.5M$1M$500K$0
'08
'09
'10
'11
'12
'13
'14
'15
'16
'17
Funding mix
By agency
DOE$8,871,322 · 17
NSF$599,993 · 2
By mechanism
—$9,471,315 · 19
Investigators at Alameda Applied Sciences Corporation
InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).
Rising Stars
First grant in the last 5 yrs
Not enough data
Emerging Leaders
6–10 yrs in
Not enough data
All-Time
Most funded here, all years
Not enough data
Largest grants
ENERGETIC CONDENSATION COATING OF CU ON STAINLESS STEEL FOR HIGH POWER COUPLERS$1,150,000
· FY2013 · Department of Energy
NB COATINGS FOR BELLOWS USED IN SRF ACCELERATORS$1,145,695
· FY2012 · Department of Energy
38A: NB-ON-CU CAVITIES FOR 700-1500 MHZ SRF ACCELERATORS$1,136,000
· FY2014 · Department of Energy
TAS::89 0227::TAS RECOVERY; NEW: RECOVERY ACT- SRF-NB THIN-FILMS GROWN USING ENERGETIC CONDENSATION FOR NB-ON-CU SRF CAVITIES; PI - MAHADEVAN KRISHNA$1,000,000
· FY2010 · Department of Energy
NB3SN DEPOSITION FOR RF ANALYSIS$849,926
· FY2008 · Department of Energy
A NOVEL WAKEFIELD GAS JET$799,996
· FY2008 · Department of Energy
LOW TEMPERATURE DEPOSITION AND RF ANALYSIS OF NB3SN, AN A-15 SUPERCONDUCTOR FOR SRF$749,931
· FY2009 · Department of Energy
A NOVEL GAS JET FOR LASER WAKEFIELD ACCELERATION$700,000
· FY2009 · Department of Energy
STTR Phase II: Light Transparent, Electrically Conductive Coatings by Filtered Cathodic Arc Plasma Deposition$499,993
· FY2002 · TIP
TAS::89 0222::TAS NEW PHASE I 2010 SBIR; TITLE: FILMS OF MO3RE TO IMPROVE THE PERFORMANCE OF EXISTING SUPERCONDUCTING RADIOFREQUENCY ACCELERATOR CAV$199,918
· FY2010 · Department of Energy
DYNAMIC MACROPARTICLE FILTERING FOR COPPER ON RF COUPLERS$150,000
· FY2014 · Department of Energy
BIASED DEPOSITION OF NB-ON-CU FOR SRF ACCELERATORS$150,000
· FY2015 · Department of Energy
TAILORED DENSITY RECTANGULAR CLUSTER JETS FOR LASER PLASMA ACCELERATORS$150,000
· FY2013 · Department of Energy
ENERGETIC CONDENSATION COATING OF NBTIN THIN FILMS FOR SRF ACCELERATOR APPLICATIONS$150,000
· FY2013 · Department of Energy
DUAL-NOZZLE GAS JETS FOR LASER PLASMA ACCELERATORS$150,000
· FY2014 · Department of Energy
SEAMLESS, NIOBIUM COATED COPPER CAVITIES FOR SRF ACCLERATORS$149,971
· FY2017 · Department of Energy
STAGED, ROTATING PLASMA, STABLE ISOTOPE SEPARATOR$149,890
· FY2013 · Department of Energy
STTR Phase I: Light Transparent, Electrically Conductive Coatings by Filtered Cathodic Arc Plasma Deposition$100,000
· FY2001 · TIP
LOW TEMPERATURE MGB2 DEPOSITION FOR SRF$89,995
· FY2008 · Department of Energy