← LeaderboardsInvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Urs Group, Inc.
Los Angeles, CA
$14,172,075
Total funding
12
Grants
Funding over time
peak $5.8M · FY2008–12$10M$7.5M$5M$2.5M$0
'08
'09
'10
'11
'12
Funding mix
By agency
DOE$14,057,202 · 10
NSF$114,873 · 2
By mechanism
—$14,172,075 · 12
Investigators at Urs Group, Inc.
InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).
Rising Stars
First grant in the last 5 yrs
Not enough data
Emerging Leaders
6–10 yrs in
Not enough data
All-Time
Most funded here, all years
Not enough data
Largest grants
TAS::89 0213::TAS NEW DOE COOPERATIVE AGREEMENT TO URS GROUP, INC. ENTITLED "EVALUATION OF CONCENTRATED PIPERAZINE FOR CO2 CAPTURE FROM COAL-FIRED FL$5,822,335
· FY2010 · Department of Energy
NEW AWARD# DE-FE0000465 TO URS GROUP ENTITLED, "EVALUATION OF DRY SORBENT TECHNOLOGY FOR PRE-COMBUSTION CO2 CAPTURE"$3,311,898
· FY2009 · Department of Energy
FIELD TESTING OF A MERCURY OXIDATION CATALYST UPSTREAM OF A WET FGD SYSTEM$2,327,745
· FY2008 · Department of Energy
PILOT TESTING OF MERCURY OXIDATION CATALYSTS FOR UPSTREAM WET FGD SYSTEMS$1,385,185
· FY2008 · Department of Energy
SORBENT INJECTION FOR SMALL ESP MERCURY CONTROL IN LOW SULFUR EASTERN BITUMINOUS COAL FLUE GAS$519,943
· FY2008 · Department of Energy
FIELD TESTING OF A WET FGD ADDITIVE FOR ENHANCED MERCURY CONTROL$427,775
· FY2008 · Department of Energy
BENCH-SCALE KINETICS STUDY OF MERCURY REACTIONS IN FGD LIQUORS$381,062
· FY2008 · Department of Energy
Ground Motion Prediction for Urban Earthqueak Disaster Mitigation$64,920
· FY2002 · ENG
REDUCTION OF WATER USE IN WET FGD SYSTEMS$58,470
· FY2008 · Department of Energy
Rapid Generation of Ground Motion Maps of the 8/17/99 Turkey and 9/20/99 Taiwan Earthquakes$49,953
· FY2000 · ENG
FULL SCALE TESTING OF A MERCURY OXIDATION CATALYST UPSTREAM OF A WET FGD SYSTEM$0
· FY2009 · Department of Energy
PILOT TESTING OF MERCURY OXIDATION CATALYSTS FOR UPSTREAM WET FGD SYSTEMS$-177,211
· FY2012 · Department of Energy