← LeaderboardsInvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
West Virginia University Research Corporation
Morgantown, WV
$502,383,132
Total funding
824
Grants
Funding over time
peak $81M · FY2005–26$100M$75M$50M$25M$0
'05
'06
'07
'08
'09
'10
'11
'12
'13
'14
'15
'16
'17
'18
'19
'20
'21
'22
'23
'24
'25
'26
Funding mix
By agency
NSF$217,977,431 · 519
DOE$209,019,104 · 123
NASA$31,327,117 · 55
DOD$24,301,423 · 51
USDA$19,758,057 · 76
By mechanism
—$502,383,132 · 824
Investigators at West Virginia University Research Corporation
InvestigatorsiAttributed = a PI's even-split share of each grant — a $1M grant with 2 PIs counts $500K each.
Exposure= the full size of every grant they're on ($1M each).
Rising Stars
First grant in the last 5 yrs
Not enough data
Emerging Leaders
6–10 yrs in
Not enough data
All-Time
Most funded here, all years
Not enough data
Largest grants
TAS::89 0213::TAS U.S. - CHINA CLEAN ENERGY RSEARCH CENTER ADVANCED COAL TECHNOLOGY COLLABORATION$28,588,188
· FY2010 · Department of Energy
MARCELLUS SHALE ENERGY AND ENVIRONMENT LABORATORY (MSEEL)$16,608,322
· FY2014 · Department of Energy
THE RESEARCH TEAM WILL DESIGN AND BUILD A HYBRID MICROWAVE-ASSISTED HEATING PROCESS (HMAP) FOR THE CALCINATION AND SINTERING OF SOLID-OXIDE ELECTROLYSIS CELL (SOEC) MATERIALS AND CELLS. THE PROJECT WILL SPAN FROM THE LAB DEMONSTRATION OF SMALL SAMPLES TO COMMERCIAL SIZE (=100 CM2). THE FINAL DELIVERABLE OF THE PROJECT WILL RESULT IN A HARDWARE SET (TWO HYBRID MICROWAVE-ASSISTED KILNS) CAPABLE OF DEMONSTRATING LOW-RISK SCALABILITY TO HIGH-VOLUME MANUFACTURING (HVM). THE FIRST KILN WILL ASSIST IN THE RAPID CALCINATION OF ELECTRODE AND ELECTROLYTE POWDERS USED TO FABRICATE SOECS. THE SECOND KILN WILL PERMIT THE ACCELERATED AND LOW-POWER SINTERING OF ALL LAYERS OF AN SOEC TO PRODUCE FULLY FUNCTIONAL SOECS.$9,279,968
· FY2025 · Department of Energy
ANALYSIS OF GEOTHERMAL DEEP DIRECT-USE COMBINED WITH RESERVOIR THERMAL ENERGY STORAGE ON THE WEST VIRGINIA UNIVERSITY CAMPUS-MORGANTOWN, WV$8,856,174
· FY2021 · Department of Energy
CENTER FOR KINETIC EXPERIMENT, THEORY, AND INTEGRATED COMPUTATION (KINETIC) PHYSICS$8,750,001
· FY2019 · Department of Energy
TAS::89 0331::TAS RECOVERY ACT - TRANSPORTATION ELECTRIFICATION AWARD TO WEST VIRGINIA UNIVERSITY$6,900,000
· FY2010 · Department of Energy
PIRE: An International Pulsar Timing Array for Gravitational Wave Detection$6,548,073
· FY2010 · O/D
DE-FE0031819 WEST VIRGINIA UNIVERSITY RESEARCH CORPORATION
DEVELOPMENT OF CORROSION- AND EROSION-RESISTANT COATINGS FOR ADVANCED ULTRA-SUPERCRITICAL MATERIALS$5,752,968
· FY2019 · Department of Energy
AS PART OF A COOPERATIVE PARTNERSHIP WITH NASA GODDARD SPACE FLIGHT CENTER (GSFC) WEST VIRGINIA UNI$5,591,117
· FY2010 · National Aeronautics and Space Administration
STORAGE TANK EMISSIONS ASSESSMENTS IN THE MARCELLUS (STEAM) TO ACQUIRE NEW KNOWLEDGE WITH SCIENCE (TANKS)
THE OVERALL OBJECTIVE IS TO ACQUIRE NEW, SCIENCE-BASED KNOWLEDGE TO IMPROVE THE OVERALL UNDERSTANDING OF METHANE AND OTHER EMISSIONS FROM STORAGE TANKS AT UPSTREAM AND MIDSTREAM OIL AND NATURAL GAS SITES IN PORTIONS OF THE APPALACHIAN BASIN, WHICH ARE KNOWN TO CONTRIBUTE TO METHANE AND VOLATILE ORGANIC COMPOUND (VOC) EMISSIONS THAT IMPACT LOCAL AND GLOBAL AIR QUALITY.$5,561,366
· FY2023 · Department of Energy
THIS PROJECT FOCUSES ON INTEGRATING HIGH-TEMPERATURE SOLID OXIDE ELECTROLYSIS (HTSE) WITH SOLAR CONCENTRATOR-TES TO GENERATE HYDROGEN FOR FURTHER USE IN SYNGAS AND OTHER FUEL PRODUCTION. THE PROPOSED WORK WILL DESIGN AND VALIDATE AN INNOVATIVE SYSTEM PROTOTYPE FOR PRODUCING GREEN HYDROGEN USING THE ADDITION OF SOLAR HEAT SUPPLY IN HOT STEAM GENERATION FOR HIGH-TEMPERATURE ELECTROLYSIS. THE TARGET LEVEL OF PERFORMANCE IS “TIER 2. DEVELOP, DESIGN, DE-RISK”. THE PROJECT WILL START FROM A TYPICAL TECHNOLOGY READINESS LEVEL (TRL) 3, WITH THE FOLLOWING OBJECTIVES.$5,000,000
· FY2025 · Department of Energy
BIPARTISAN INFRASTRUCTURE LAW (BIL) - SEPARATION OF RARE EARTH OXIDES AND REDUCTION TO METAL PRODUCTS
THE OVERALL OBJECTIVE OF THIS PROJECT IS TO DESIGN, DEVELOP, AND DEPLOY INNOVATIVE PROCESS TECHNOLOGIES TO PRODUCE SALABLE RARE EARTH METALS AND CRITICAL MINERALS (CM) FROM ACID MINE DRAINAGE (AMD) FEEDSTOCKS AT A REDUCED COST TO REDUCE OUR NATION’S VULNERABILITY FROM INTERNATIONAL COMPETITORS.$5,000,000
· FY2025 · Department of Energy
DE-FE0031834 WITH WEST VIRGINIA UNIVERSITY RESEARCH CORPORATION TITLED ''DEVELOPMENT AND TESTING OF AN INTEGRATED ACID MINE DRAINAGE (AMD) TREATMENT AND RARE EARTH/CRITICAL MINERAL PLANT''.$4,998,312
· FY2019 · Department of Energy
I/UCRC Phase II: Center for Identification Technology Research$4,356,813
· FY2017 · CSE
RII Track 2 FEC: Multi-Scale Integrative Approach to Digital Health: Collaborative Research and Education in Smart Health in West Virginia and Arkansas$3,999,998
· FY2019 · O/D
WEST VIRGINIA EARLY CHILDHOOD OBESITY PREVENTION PROJECT$3,924,771
· FY2011 · National Institute of Food and Agriculture
WVU Program for Retaining Institutional Diversity and Equity$3,848,330
· FY2010 · EDU
DEVELOPMENT OF CONTINUOUS SOLVENT EXTRACTION PROCESSES FOR COAL-DERIVED CARBON PRODUCTS$3,729,701
· FY2008 · Department of Energy
GOALS&OBJECTIVES THE OVERARCHING GOAL OF THE NASA WEST VIRGINIA SPACE GRANT CONSORTIUM (WVSGC) IS TO EXTEND THE BENEFITS OF NASA'S RESEARCH AND EDUCA$3,614,506
· FY2015 · National Aeronautics and Space Administration
WEST VIRGINIA UNIVERSITY RESEARCH CORPORATION. CLEAN CITIES FY 09 PETROLEUM REDUCTION TECHNOLOGIES PROJECTS FOR TRANSPORTATION SECTOR. DE-PS26-09NT$3,561,780
· FY2009 · Department of Energy