GGrantIndex
← Leaderboards

University Of North Dakota

Grand Forks, ND

Compare ↔
$842,788,540
Total funding
600
Grants

Funding over time

peak $167.7M · FY200525
$200M$150M$100M$50M$0
'05
'06
'07
'08
'09
'10
'11
'12
'13
'14
'15
'16
'17
'18
'19
'20
'21
'22
'23
'24
'25

Funding mix

By agency

DOE$521,941,101 · 95
NIH$252,947,459 · 426
NASA$46,473,275 · 47
DOD$18,655,295 · 19
USDA$1,298,824 · 8
CDC$990,000 · 2
AHRQ$482,585 · 1
SAMHSA$0 · 2

By mechanism

$588,368,496 · 169
P20$121,847,797 · 268
R01$69,118,494 · 54
U54$20,300,000 · 8
R21$8,910,248 · 26
P30$7,198,181 · 6

Investigators at University Of North Dakota

Largest grants

INCREASE THE TOTAL PROJECT COSTS TO FULLY ACCOUNT FOR TASK 14; FULLY FUND PHASE II, BP2; REMOVE BUY AMERICAN ACT ARTICLE; REVISE REPORTING (SF-425)$74,124,458
· FY2009 · Department of Energy
PLAINS CO2 REDUCTION PARTNERSHIP (PCORP) PHASE II$47,919,668
· FY2008 · Department of Energy
BIPARTISAN INFRASTRUCTURE LAW (BIL) COAL CREEK CARBON CAPTURE: SITE CHARACTERIZATION AND PERMITTING. THE OBJECTIVE OF THIS PROJECT IS ADVANCE DEVELOPMENT OF A LARGE-SCALE COMMERCIAL GEOLOGIC CARBON DIOXIDE (CO2) STORAGE HUB THROUGH SITE CHARACTERIZATION AND PERMITTING OF A GEOLOGIC STORAGE COMPLEX IN CENTRAL NORTH DAKOTA TO STORE UP TO 200 MILLION METRIC TONS (MT) OF CO2 AND FULFILL THE GOALS OF THE U.S. DEPARTMENT OF ENERGY’S (DOE’S) CARBONSAFE (CARBON STORAGE ASSURANCE FACILITY ENTERPRISE) INITIATIVE PROGRAM. THE OBJECTIVES OF BUDGET PERIOD (BP) 1 ARE TO FULLY CHARACTERIZE THE PROPOSED STORAGE COMPLEX, PREPARE AND SUBMIT UNDERGROUND INJECTION CONTROL (UIC) CLASS VI PERMIT APPLICATIONS AND U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA) NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) DOCUMENTATION, AND IMPLEMENT A COMMUNITY BENEFITS PLAN (CBP) TO ENGAGE A DIVERSE, INCLUSIVE SET OF COMMUNITY STAKEHOLDERS AND HELP BUILD THE VALUES OF DIVERSITY, EQUITY, INCLUSION, AND ACCESSIBILITY (DEIA); ENVIRONMENTAL JUSTICE; BROAD-BASED COMMUNITY ENGAGEMENT; AND WORKER SUPPORT MORE DEEPLY INTO ALL PROJECT ACTIVITIES. THE OBJECTIVE OF BP2 IS TO COMPILE THE NECESSARY INFORMATION TO INFORM THE FINAL INVESTMENT DECISION AND PREPARE THE PROJECT FOR TRANSITION INTO A COMMERCIAL CARBON CAPTURE AND STORAGE (CCS) PROJECT THROUGH COMPLETION OF A PIPELINE FRONT-END ENGINEERING AND DESIGN (FEED) STUDY AND FINALIZATION OF A STORAGE FIELD DEVELOPMENT PLAN AND BUSINESS AND FINANCIAL PLANS AND ARRANGEMENT.$42,838,265
· FY2023 · Department of Energy
EERC DOE JOINT PROGRAM ON RESEARCH AND DEVELOPMENT FOR FOSSIL ENERGY-RELATED RESOURCES$32,778,804
· FY2017 · Department of Energy
NEW AWARD EERC DOE JOINT PROGRAM ON R AND D FOR FOSSIL ENERGY RELATED RESOURCES$26,670,236
· FY2008 · Department of Energy
MODIFICATION 004 - CONTINUATION INTO BP2$25,138,655
· FY2009 · Department of Energy
DEVELOPING AND VALIDATING PRESSURE MANAGEMENT AND PLUME CONTROL STRATEGIES$19,760,093
· FY2017 · Department of Energy
DE-FE0031889 NEW AWARD TO UNIVERSITY OF NORTH DAKOTA NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING$17,395,204
· FY2021 · Department of Energy
DC-8 TRANSFER TO CREATE A NATIONAL SUBORBITAL EDUCATION AND RESEARCH CENTER.$16,439,596
· FY2008 · National Aeronautics and Space Administration
DE-FE0031838 - UNIVERSITY OF NORTH DAKOTA - PROJECT TITLED: ''PLAINS CO2 REDUCTION PARTNERSHIP INITIATIVE TO ACCELERATE CARBON CAPTURE, UTILIZATION, AND STORAGE DEPLOYMENT - NEW AWARD$15,000,000
· FY2019 · Department of Energy
THE OBJECTIVE OF THIS PROJECT IS TO INVESTIGATE THE CONCEPT THAT CARBON DIOXIDE (CO2) INJECTED INTO AN UNCONVENTIONAL OIL RESERVOIR IN THE BAKKEN FORMATION WILL RESULT IN INCREMENTAL OIL RECOVERY WHILE SIMULTANEOUSLY STORING CARBON DIOXIDE (CO2), RESULTING IN LOWER-CARBON-INTENSITY OIL PRODUCTION. THIS OBJECTIVE WILL BE MET BY CONDUCTING LABORATORY STUDIES AND FIELD-BASED ACTIVITIES INCLUDING A PILOT TEST IN A FIELD LABORATORY AIMED AT INJECTING CARBON DIOXIDE (CO2) FOR A MINIMUM OF 18 MONTHS INTO A BAKKEN RESERVOIR FOR ENHANCED OIL RECOVERY (EOR) AND ACCOUNTING FOR ASSOCIATED GEOLOGIC STORAGE OF CARBON DIOXIDE (CO2).$11,600,000
· FY2025 · Department of Energy
NEW AWARD: "CENTER FOR BIOMASS UTILIZATION"$10,968,053
· FY2008 · Department of Energy
DEVELOPMENT OF A NATIONAL CENTER FOR HYDROGEN TECHNOLOGY$10,296,123
· FY2008 · Department of Energy
DE-FE0029488; NEW AWARD ENTITLED: ''''NORTH DAKOTA INTEGRATED CARBON STORAGE COMPLEX FEASIBILITY STUDY''$9,424,125
· FY2017 · Department of Energy
EERC-DOE JOINTLY SPONSORED RESEARCH PROGRAM$9,067,460
· FY2008 · Department of Energy
ROUGHRIDER CARBON STORAGE HUB THIS PROJECT SEEKS TO DETERMINE THE FEASIBILITY OF DEVELOPING A COMMERCIAL-SCALE CARBON DIOXIDE (CO2) GEOLOGIC STACKED STORAGE COMPLEX ABLE TO STORE 50+ MILLION METRIC TONS OF CO2 OVER A 30-YEAR TIMEFRAME IN NORTHWESTERN NORTH DAKOTA. A STRATIGRAPHIC TEST WELL WILL BE DRILLED TO DETERMINE ROCK PROPERTIES, WHICH WILL BE USED FOR MODELING AND SIMULATION OF AN INJECTED CO2 PLUME OVER TIME. THESE MODELS AND SIMULATIONS WILL SERVE AS THE BASIS OF THE CLASS VI UNDERGROUND INJECTION CONTROL (UIC) PERMIT APPLICATION WHICH WILL BE SUBMITTED TO THE STATE OF NORTH DAKOTA WHICH HAS CLASS VI PRIMACY FROM THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY (US EPA).$9,000,000
· FY2023 · Department of Energy
TAS::89 0213::TAS - FE - NEW AWARD DE-FE0003466 - YEAR 6 OF THE PROJECT TITLED NATIONAL CENTER FOR HYDROGEN TECHNOLOGY AT THE UNIVERSITY OF NORTH DAK$8,635,987
· FY2010 · Department of Energy
BIPARTISAN INFRASTRUCTURE LAW (BIL) - RECOVERY AND REFINING OF RARE EARTH ELEMENTS FROM LIGNITE MINE WASTES THE PROJECT WILL DEVELOP A CLASS 3 COST ESTIMATE AND ASSOCIATED FRONT-END ENGINEERING DESIGN (FEED) STUDY ACCORDING TO THE AMERICAN ASSOCIATION OF COST ENGINEERS (AACE) CLASS 3 GUIDELINES FOR THE PROPOSED RARE EARTH ELEMENTS (REE) DEMONSTRATION FACILITY.$7,999,999
· FY2023 · Department of Energy
DE-FE0031789 UNIVERSITY OF NORTH DAKOTA - CARBON DIOXIDE ENHANCED OIL RECOVERY IMPROVEMENT IN CONVENTIONAL FIELDS USING RICH GAS$7,973,881
· FY2019 · Department of Energy
EERC CENTER FOR BIOMASS UTILIZATION$6,992,236
· FY2010 · Department of Energy