← Leaderboards
Theodore Hazlett
University Of Illinois Urbana-Champaign
$564,476
Attributed
$564,476
Total exposure
8
Grants
4
Lead (contact PI)
Attributed= this PI's even-split share of every grant they're on (the fair, additive number). Exposure = full size of all those grants. They are the sole PI on all grants (the two match).
Funding over time
peak $174.6K · FY2005–08$200K$150K$100K$50K$0
'05
'06
'07
'08
Funding mix
By agency
NIH$564,476 · 8
By mechanism
P41$564,476 · 8
Top collaborators
No co-investigators on record.
Most similar at University Of Illinois Urbana-Champaign
Same institution · by research overlap
- Neil L Kelleher$32,542,329
- Jonathan V. Sweedler$31,232,175
- Enrico Gratton$20,507,614
- Peter T. So$16,470,414
- Pieter C Dorrestein$10,925,542
Others in their field
Top investigators on “Vesicle”
- Marinella Temprosa · George Washington University$48,628,632
- Peter J Novick · Yale University$23,787,858
- Allan W Wolkoff · Yeshiva University$22,839,993
- Sandra L. Schmid · Scripps Research Institute$20,412,463
- Jose Rizo-Rey · Ut Southwestern Medical Center$19,806,380
- James E Rothman · Sloan-Kettering Institute For Cancer Res$18,867,780
Research focus
VesicleBiological ProductsBiomedical FacilityBiomedical ResourceComputer Retrieval Of Information On Scientific Projects DatabaseDiffusionFluorescenceFluorophoreFundingGrantInstitutionThinking, FunctionUnited States National Institutes Of HealthBinding ProteinsLightMembraneMotionMovementParticlePractical ApplicationProgramsProteinsResearch PersonnelResources
Grant awards (10)
POLARIZED FCS$15,336
P41 · FY2008 · RR · contact PI
POLARIZED FCS$13,454
P41 · FY2007 · RR · contact PI
MEASURING ANGULAR FLUCTUATIONS WITH POLARIZED FCS$120,466
P41 · FY2006 · RR · contact PI
SCHEDULED MAINTENANCE & DOWNTIME OF LFD FACILITY$54,167
P41 · FY2006 · RR · contact PI
SCHEDULED MAINTENANCE &DOWNTIME OF LFD FACILITY$36,561
P41 · FY2005 · RR
MEASURING ANGULAR FLUCTUATIONS WITH POLARIZED FCS$21,530
P41 · FY2005 · RR
PROTEIN-PROTEIN &PROTEIN-LIGAND INTERACTIONS$15,346
P41 · FY2004 · RR
SCHEDULED MAINTENANCE &DOWNTIME OF LFD FACILITY$15,346
P41 · FY2004 · RR
PROTEIN PROTEIN &PROTEIN LIGAND INTERACTIONS$248,088
P41 · FY2002 · RR
PROTEIN PROTEIN &PROTEIN LIGAND INTERACTIONS$24,182
P41 · FY2000 · RR