← Leaderboards
Michael J Olsen
Oregon State University
$2,034,833
Attributed
$7,638,629
Total exposure
10
Grants
4
Lead (contact PI)
Attributed= this PI's even-split share of every grant they're on (the fair, additive number). Exposure = full size of all those grants.
Funding over time
peak $5.9M · FY2011–22$10M$7.5M$5M$2.5M$0
'11
'12
'13
'14
'15
'16
'17
'18
'19
'20
'21
'22
Funding mix
By agency
NSF$7,638,629 · 10
By mechanism
—$7,638,629 · 10
Top collaborators
- Ben A Leshchinsky2 shared
- Joseph Wartman2 shared
- Michael J Bailey2 shared
- Andre R Barbosa1 shared
- Armin W Stuedlein1 shared
- Chase H Simpson1 shared
- Christopher E Parrish1 shared
- Christopher I Massey1 shared
Grant awards (10)
Collaborative Research: Parameterizing The Drivers and Timing of Post-Earthquake Landslides$512,967
· FY2022 · ENG
RAPID: Structural Assessments for Buildings Exposed to a Corrosive Environment: Data Collection at the Blue Heron Paper Mill, Historical Industrial Site at Willamette Falls, Oregon$119,902
· FY2022 · ENG
Earthquake Resilience of the Western Power Grid$441,792
· FY2019 · ENG
Planning Grant: Engineering Research Center for Built Infrastructure Geospatial Data Acquisition, Visualization, and Analysis (BIGDAVA)$99,999
· FY2019 · ENG · contact PI
RAPID: Quantifying Temporal Changes in Rockfall Magnitude-Frequencies for Well-Characterized Rockslopes Shaken by the 2018 Alaska Earthquake$55,000
· FY2019 · ENG
Natural Hazards Engineering Research Infrastructure: Post-Disaster, Rapid Response Research (RAPID) Facility$5,853,000
· FY2016 · ENG
RAPID/Collaborative Research: Post-Disaster, Reinforced Concrete Building Performance Data Collection following the April 25, 2015 Nepal Earthquake$57,286
· FY2015 · ENG
CAREER/CDS&E: Advanced, 3D Infrastructure Information Modeling Using Lidar$400,000
· FY2014 · ENG · contact PI
RAPID/Collaborative Research: Investigation of the Effects of Rockfall Impacts on Structures During the Christchurch Earthquake Series$84,995
· FY2014 · ENG · contact PI
Collaborative Research: RAPID - Post-Disaster Structural Data Collection Following the 11 March 2011 Tohoku, Japan Tsunami$13,688
· FY2011 · ENG · contact PI