← Leaderboards
J Ramon Arrowsmith
Arizona State University
$5,671,466
Attributed
$11,229,858
Total exposure
25
Grants
18
Lead (contact PI)
Attributed= this PI's even-split share of every grant they're on (the fair, additive number). Exposure = full size of all those grants.
Funding over time
peak $2.6M · FY2005–24$5M$3.8M$2.5M$1.3M$0
'05
'06
'07
'08
'09
'10
'11
'12
'13
'14
'15
'16
'17
'18
'19
'20
'21
'22
'23
'24
Funding mix
By agency
NSF$11,229,858 · 25
By mechanism
—$11,229,858 · 25
Top collaborators
- Christopher Campisano4 shared
- Kaye E Reed3 shared
- Asfawossen Asrat2 shared
- Chelsea P Scott2 shared
- Jonathan G Wynn2 shared
- Matthew J Fouch2 shared
- Steven C Semken2 shared
- Albert Boggess1 shared
Grant awards (25)
Collaborative Research: Sustained Resources: OpenTopography - An AI-ready Cyberinfrastructure Facility for Advancing Our Understanding of a Changing Earth$291,559
· FY2024 · GEO
Collaborative Research: Human Infrastructure for a National Geochronology Consortium: Micro-Funding an Inclusive Community Grassroot Effort to Better Understand the Earth System$1,827,627
· FY2022 · GEO · contact PI
Collaborative Research: OpenTopography - A cyberinfrastructure facility for advancing geoscience research and education$394,525
· FY2020 · GEO · contact PI
FDSS: Implementing an Interdisciplinary Space Physics Program at Arizona State University$1,488,347
· FY2019 · GEO
Collaborative Research: Hominin diversity, paleobiology, and behavior at the terminal Pliocene$108,203
· FY2019 · SBE · contact PI
Collaborative Proposal: Community Facility Support for OpenTopography -- a Cyberinfrastructure Facility for Topographic Data and Services$61,776
· FY2019 · GEO · contact PI
Structural Geology and Tectonics Forum at Arizona State University, Tempe, AZ, January 4-9, 2018$34,599
· FY2017 · GEO · contact PI
Collaborative Research: OpenTopography: A Cyberinfrastructure Facility for Topographic Data, Services, and Knowledge$155,716
· FY2016 · GEO · contact PI
Collaborative Research: EarthScope Geochronology Graduate Student Training Program$285,823
· FY2014 · GEO · contact PI
Collaborative Research: Low-cost imaging and analysis of the August 24, 2014 M6.0 South Napa California earthquake surface rupture (RAPID)$16,258
· FY2014 · GEO · contact PI
Collaborative Research: The Hominid Sites And Paleolakes Drilling Project: Acquiring a High Resolution Paleoenvironmental Context of Human Evolution$251,145
· FY2012 · GEO
Collaborative Research: Paleoanthropological investigation of the Ledi-Geraru hominin site (Afar, Ethiopia)$200,024
· FY2012 · SBE
IPG: Collaborative Research: A high-resolution analysis of unique paleoenvironmental data from key hominin sites in East Africa$117,251
· FY2012 · SBE
Collaborative Research: 3-D Near-field Coseismic Deformation from Differential LiDAR with Application to the El Mayor-Cucapah Earthquake$89,333
· FY2012 · GEO · contact PI
Earth Science Education and Outreach Provider Summit$33,050
· FY2012 · GEO
Bridging Data, New Technologies, and Communities to Enable and Communicate EarthScope Exploration and Discovery$2,615,614
· FY2011 · GEO · contact PI
Facility Support: OpenTopography - A National Hub for High Resolution Topographic Data, Tools, and Knowledge$307,462
· FY2009 · GEO · contact PI
Collaborative Research: Facility Support: Building the INTERFACE Facility for Cm-Scale, 3D Digital Field Geology$186,840
· FY2007 · GEO · contact PI
Collaborative Research: Is the Holocene Slip Rate along the Altyn Tagh Fault 10 mm/y, 30 mm/y, or Both? Infilling a 2-6 ka Data Gap Using 14C, OSL, and Stream Reconstructions$195,494
· FY2006 · GEO · contact PI
Collaborative Research: Neotectonics across an active oblique-divergent plate margin, southwestern Gulf of California$164,152
· FY2005 · GEO · contact PI
BE/CNH: Land-Use and Landscape Socioecology in the Mediterranean Basin: A Natural Laboratory for the Study of the Long-Term Interaction of Human and Natural Systems$1,523,996
· FY2004 · SBE
Collaborative Research: Multi-cycle Rupture History of the San Andreas Fault in the Carrizo Plain$90,987
· FY2004 · GEO · contact PI
Kilometer-Scale Fault Zone Structure and Kinematics Along the San Andreas Fault near Parkfield, California$187,955
· FY2003 · GEO · contact PI
ITR Collaborative Research: GEON: A Research Project to Create Cyberinfrastructure for the Geosciences$400,000
· FY2002 · GEO · contact PI
ITR/IM+AP(GEO)Collaborative Research:Creation of a Geospatial Data System for the Transition Between the Colorado Plateau and Basin and Range Provinces (Geoinformatics in Action)$202,122
· FY2001 · GEO · contact PI