THE PHASE 1 SYSTEM FEASIBILITY AND TRADE STUDIES WILL ADDRESS THE KNOWN UNKNOWNS OF THE SYSTEM DESIGN THAT IMPACT PERFORMANCE AND OPERATIONAL SUITABILITY OF THE SYSTEM.
$20,000FY2021National Aeronautics and Space AdministrationNASA
Georgia Tech Research Corp