A 3-MONTH STUDY IS PROPOSED TO SETUP A LABORATORY EXPERIMENT TO ILLUSTRATE CHARGE DEFLECTION OF AN ELECTROSTATICALLY INFLATED GOSSAMER STRUCTURE. A L
$52,757FY2014National Aeronautics and Space AdministrationNASA
The Regents Of The University Of Colorado