THE OVERALL OBJECTIVE OF GRID-READY WIND PROJECT IS TO DEMONSTRATE THE ABILITY OF UTILITY SCALE WIND POWER PLANTS (WPPS) TO PROVIDE TRADITIONAL AND EMERGING GRID SERVICES (GSS) (IN BOTH GRID-FOLLOWING (GFL) AND GRID FORMING (GFM) MODE) THROUGH A CENTRALIZED CONTROL FRAMEWORK (ALONGSIDE LOCAL CONTROL AUGMENTATION AS REQUIRED AT THE WIND TURBINE GENERATOR). THROUGHOUT THE PROJECT DURATION, TO THE EXTENT POSSIBLE, THE GRID-READY WIND PROJECT TEAM WILL MAKE RECOMMENDATIONS ON HOW THE GRID SERVICES DEMONSTRATED USING WPPS ARE APPLICABLE TO OTHER INVERTER-BASED RESOURCES (IBRS) LIKE PHOTOVOLTAIC (PV) SYSTEMS AND BATTERY ENERGY STORAGE SYSTEM (BESS). THESE RECOMMENDATIONS WOULD BE MADE NOTING THE INHERENT DIFFERENCES IN THE DC SIDE DYNAMICS OF THESE RESOURCES OWING TO THE NATURE OF THE ENERGY GENERATION.

$2,933,102FY2025Department of EnergyDOE

Ge Vernova Operations Llc

Investigators