ELECTRIC VEHICLE CHARGING HUBS WITH ENERGY STORAGE AND FLOATING SOLAR THE PRIMARY OBJECTIVE OF THIS PROJECT IS TO INSTALL DIRECT CURRENT FAST CHARGE (DCFC) STATIONS IN AT LEAST FIVE HUBS WITHIN THE FLORIDA CONGRESSIONAL DISTRICT 10. EACH LOCATION WILL HAVE A MINIMUM OF ONE DUAL PORT DCFC CHARGING STATION AND AT LEAST ONE LOCATION WILL INCLUDE FLOATING SOLAR AND BATTERY STORAGE. THE WORK INCLUDES INSTALLING BOTH THE CHARGING STATIONS AND THE SUPPORTING INFRASTRUCTURE.
$3,000,000FY2025Department of EnergyDOE
Orlando Utilities Commission