IN THE FIRST QUARTER OF THE PROJECT, THE ESCO WILL WORK WITH THE CITY OF SHAWNEE TO DETERMINE THE BEST LAYOUT AND SCHEDULE FOR THE SOLAR ARRAY ON FS71. IN THE SECOND QUARTER OF THE PROJECT, FS1 WILL BE FITTED WITH 99.8 KW DC SOLAR PANELS, RACKING, INVERTERS, OPTIMIZERS, LOAD CENTER, AND DISCONNECT. AS PART OF THE PROJECT, THE ESCO WILL INSTALL A REAL-TIME DATA ANALYTICS INFORMATION MANAGEMENT SYSTEM INTEGRATED WITH THE UTILITY METERS. THIS WILL EVALUATE OPERATION OF THE UTILITY SYSTEM AND VERIFY OPERATION OF EQUIPMENT AND ENSURE OPTIMUM OPERATION FOR ENERGY EFFICIENCY. THIS WILL BE USED FOR THE MONITORING AND VERIFICATION OF THE PROJECT IN THE FOLLOWING YEARS.