THIS PROJECT IS DIRECTED AT IDENTIFYING, TESTING, AND IMPLEMENTING WITHIN 2 YEARS ULTRAVIOLET LIGHT (UV)+TEMPERATURE TOLERANT MATERIALS AND CELL STACK DESIGNS FOR 27% MECHANICALLY-STACKED PEROVSKITE+SILICON HYBRID TANDEM PHOTOVOLTAIC (PV) MODULES WITH =300 CM2 APERTURE AREAS THAT PASS IEC 61215 MODULE QUALITY TEST (MQT) 10, 11, 13, AND 21 AND ISOS-L-2 AND EXHIBIT <3% RELATIVE POWER LOSS AFTER 6 MONTHS OF CONTINUOUS OUTDOOR OPERATION.
$5,197,852FY2025Department of EnergyDOE
Tandem Pv, Inc.