NEW RIVER FEEDER ELECTRICAL SUBSTATION THE RECIPIENT WILL ADD TWO NEW CIRCUITS ALLOWING THE NEW RIVER SUBSTATION TO ASSUME MUCH OF THE ENERGY DELIVERY BURDEN CURRENTLY DELIVERED THROUGH THE BABB STREET SUBSTATION. THE ANTICIPATED OUTCOME OF THIS AWARD IS FOR TWO NEW CIRCUITS TO BE CONSTRUCTED FOR THE NEW RIVER SUBSTATION, FOR THEM TO BE COMMISSIONED AND PUT INTO OPERATION TO INCREASE CAPACITY AND RESILIENCE OF POWER DELIVERY TO THE CITY OF FALLON.
$879,835FY2025Department of EnergyDOE
City Of Fallon