BIPARTISAN INFRASTRUCTURE LAW (BIL) 13 MEGAWATT PILOT OF SECOND-USE BATTERIES INCORPORATING MODULE LEVEL POWER CONVERSION TO IMPROVE BATTERY SAFETY AND PERFORMANCE THE OBJECTIVE OF THE PROJECT IS TO DEPLOY A 13MW (MEGAWATT) BATTERY ENERGY STORAGE FACILITY WITH A GOAL OF SUCCESSFULLY DEMONSTRATING SAFE AND HIGH PERFORMING OPERATION USING RECALLED SECOND-LIFE ELECTRIC VEHICLE BATTERIES.
$7,888,476FY2023Department of EnergyDOE
Element Energy, Inc.